Components of successful implementation of the 988 Suicide and Crisis Lifeline

By: Danielle Stumpf,

A staff consultant in BerryDunn’s State Government Practice Group, Roshani works with the state clients to understand their existing needs and helps them improve their business processes and systems to better serve the public. She works primarily in the behavioral and public health sectors.

Roshani Khatri,

A Government Consultant in BerryDunn’s State Government Practice Group, Laura supports clients who are addressing difficult social issues such as mental health stigma, diversity and inclusion, and health equity. She works primarily in the behavioral health and developmental disabilities sectors. 

Laura Perez,

A Senior Consultant in BerryDunn’s State Government Practice Group, Kat works with clients as a project management consultant, specializing in organizational change management, communications, training, and implementation.

Kat Crumpton,

A Manager in BerryDunn’s State Government Practice Group, Stephanie works with clients to support public health programs and improve policies and systems that support agency operations. She works primarily with state public health agencies.

Stephanie U'Ren
10.03.22

Read this if you are at a state agency looking to implement or improve your 988 Suicide & Crisis Lifeline. 

Between 2015 and 2020, one in four fatal police shootings involved a person with a mental illness, and an estimated 44% of people incarcerated in jail and 37% of people incarcerated in prison had a mental health condition. In addition, the recent COVID-19 pandemic has adversely impacted the mental health situation in the country. 

Many people experiencing mental health distress call 911 because it is a widely known emergency number and easy to use. Recent data has shown that people using 911 to get help with serious mental illness do not get the right care at the right time and some even end up in law enforcement custody, rather than being seen by a mental health professional.

The 988 Suicide & Crisis Lifeline (formerly known as the National Suicide Prevention Lifeline) is the new three-digit, nationwide phone number that is locally operated and offers 24/7 access via call, text, and chat to trained crisis counselors who can help individuals experiencing mental health-related distress. Mental health-related distress can include substance use crisis, suicidal thoughts, depression, or any emotional distress. The 988 Suicide & Crisis Lifeline is also available for individuals worried about a loved one who might need crisis support services. Its goal is to provide accessible and immediate crisis intervention and support to every individual in need. 

988 state implementation and top challenges

As of August 2022, 23 states have passed legislation to facilitate the implementation of the 988 Suicide & Crisis Lifeline. Colorado, Nevada, and Washington enacted legislation with user fees to support 988 operations and provide financial sustainability for the system. Several states have established advisory groups or planning committees with representatives from state agencies, health providers, law enforcement, emergency medical services, and other partners to better coordinate the system and identify policy levers. 

Implementing a three-digit number for behavioral health emergencies in every state and providing 24/7 primary coverage through in-state call centers have presented certain challenges to states across the nation. As states prepare to launch the 988 hotlines, they have encountered key issues around infrastructure, workforce, 911 integration, readiness of the crisis care continuum, cultural competence, and performance management.  

Solutions for state agencies

To address these key issues, states should consider the following to aid in the successful implementation of the 988 Suicide & Crisis Lifeline:

Assess the states’ needs to successfully implement the 988 Suicide & Crisis Lifeline

Despite meeting baseline requirements for the implementation of the 988 Suicide & Crisis Lifeline, state agencies are struggling to implement the 988 Suicide & Crisis Lifeline. 

By performing a structured needs assessment, state agencies can evaluate their infrastructure, policies and procedures, funding, and workforce needs to better understand their readiness to implement and capability to sustain the 988 Suicide & Crisis Lifeline. This assessment provides insight for state agencies to understand their strengths, challenges, and areas of opportunity, and it should evaluate: 

  • State infrastructure
    Behavioral health leaders acknowledge that infrastructure supports are necessary to make the 988 Suicide & Crisis Lifeline work across the continuum of care. It is important to assess the infrastructure across the crisis care continuum to help ensure a smooth transition for individuals who need care quickly. Successful implementation should take certain considerations into account during the planning process, such as including all the interested parties representing diverse populations.
  • Workforce
    In the current labor market, workforce availability and retention are top concerns for sustainable and effective 988 Suicide & Crisis Lifeline operations. States are struggling to hire the extra staff needed to launch the 988 Suicide & Crisis Lifeline as well as to recruit qualified persons. To realistically implement the system, innovative workforce development and supporting wages to recruit and retain a specialized workforce are critical considerations for the states. Critical components to include in the assessment should include, but are not limited to:
    • Training
      Staff training and proper supervision will be crucial to effectively manage the 988 Suicide & Crisis Lifeline, and states need best practices models for how to best train crisis responders and the call center staff. States should assess the existing training infrastructure to identify ways early on to support the mental health of their 988 Suicide & Crisis Lifeline counselors to reduce the risk for burnout and post-traumatic stress disorder. 
    • Capacity
      Adequate capacity is a key factor to workforce. The assessment should identify the number of qualified workforce available for in-person staffing. In the current labor market, it will also be important to consider including the identification of the number of qualified staff able to work remotely. If states would like to consider remote capabilities for the call centers, it will also be important to assess the available technology necessary, as well as the development of standards and expectations, including strong communication. 
  • Readiness of the crisis care continuum
    Apprehension about the readiness of the crisis care continuum (e.g., mobile crisis teams through diversion services and lower levels of care) exist. Federal officials have stated they expect up to 12 million calls/texts/chats in the first year of the 988 Suicide & Crisis Lifeline, and research suggests approximately 20% of those calls/texts/chats will require some level of in-person response. States are questioning whether mobile crisis teams are prepared for the increased demand while also identifying connections and access to upstream services. In addition, states can consider the needs and experiences of the system’s end users to help address equity. The assessment can help to assess the readiness of the various components across the crisis care continuum.

Establish a strategic plan of action to implement the 988 Suicide & Crisis Lifeline 

With the implementation of the 988 Suicide & Crisis Lifeline, state agencies have an opportunity to strengthen crisis care. The best way to begin strengthening crisis care is to develop and implement strategic plans that optimize the 988 Suicide & Crisis Lifeline and the following services. Building on the strengths and opportunities identified in the needs assessment and the associated recommendations, strategic plans can establish priorities and identify sustainable solutions that build capacity, promote equitable access to care, and promote continuous quality improvement. Collaborating with key stakeholders to develop a strategic plan can help identify a roadmap for how the state should approach the implementation, maintenance, and sustainability of the 988 Suicide & Crisis Lifeline, including, but not limited to, the following areas:

  • Data and performance management
  • Stakeholder engagement
  • Health equity
  • Voice of the customer
  • Financial sustainability

Maximize available funding streams

Historically, behavioral health has not had sufficient funding to adequately address mental health and substance use disorder prevention, treatment, and recovery services across the continuum of care. The COVID-19 pandemic exacerbated behavioral health challenges for many individuals struggling and highlighted the challenges with the infrastructure and workforce. In the last couple of years, the federal administration has continued to allocate additional funding to supplement existing and ongoing federal funding. States should begin by evaluating the existing federal funding opportunities to support the implementation of the 988 Suicide & Crisis Lifeline. According to the Substance Abuse and Mental Health Services Administration’s (SAMHSA) 988 Convening Playbook for States, Territories, and Tribes, below are a few examples of funding sources that can be leveraged for the implementation of the 988 Suicide & Crisis Lifeline. 

  • SAMHSA 
    • Transformation Transfer Initiative
    • Community Mental Health Services Block Grant
    • Substance Abuse and Treatment Block Grant
    • Mental Health Block Grant Set-aside
    • State Opioid Response Grant
    • Tribal Opioid Response Grants
  • American Rescue Plan Act (ARPA) of 2021—for Mobile Crisis and Crisis Line Services
  • Medicaid
    • Early, Periodic, Screening, Diagnosis, and Treatment (known as EPSDT)
    • 1915(a) waivers
    • 1915(b) waivers
    • 1115 SMI/SED Service Delivery Waiver

The implementation of the 988 Suicide & Crisis Lifeline is critical to supporting the community and meeting their needs at a time where they need community support the most. If you have any questions, please contact BerryDunn’s behavioral health consulting team. We’re here to help.

Related Industries

Related Services

Consulting

Related Professionals

Principals

BerryDunn experts and consultants

There’s a good chance that your organization is in the position of needing to do more with less under the strain of staffing constraints and competing initiatives. With fewer resources to work with, you’ll need to be persuasive to get the green light on new enterprise technology initiatives. To do that, you need to present decision makers with well-thought-out and targeted business cases that show your initiative will have impact and will be successful. Yet developing such a business case is no walk in the park. Perhaps because our firm has its roots in New England, we sometimes compare this process to leading a hiking trip into the woods—into the wild. 

Just as in hiking, success in developing a business case for a new initiative boils down to planning, preparation, and applying a few key concepts we’ve learned from our travels. 

Consensus is critical when planning new technology initiatives

Before you can start the hike, everyone has to agree on some fundamentals: 

Who's going? 

Where are we going? 

When do we go and for how long? 

Getting everyone to agree requires clear communication and, yes, even a little salesmanship: “Trust me. The bears aren’t bad this time of year.” The same principle applies in proposing new technology initiatives; making sure everyone has bought into the basic framework of the initiative is critical to success.

Although many hiking trips involve groups of people similar in age, ability, and whereabouts, for your business initiative you need to communicate with diverse groups of colleagues at every level of the organization. Gaining consensus among people who bring a wide variety of skills and perspectives to the project can be complex.

To gain consensus, consider the intended audiences of your message and target the content to what will work for them. It should provide enough information for executive-level stakeholders to quickly understand the initiative and the path forward. It should give people responsible for implementation or who will provide specific skills substantive information to implement the plan. And remember: one of the most common reasons projects struggle to meet their stated objectives (and why some projects never materialize to begin with), is a lack of sponsorship and buy-in. The goal of a business case is to gain buy-in before project initiation, so your sponsors will actively support the project during implementation. 

Set clear goals for your enterprise technology project 

It’s refreshing to take the first steps, to feel that initial sense of freedom as you set off down the trail. Yet few people truly enjoy wandering around aimlessly in the wilderness for an extended period of time. Hikers need goals, like reaching a mountain peak or seeing famous landmarks, or hiking a predetermined number of miles per day. And having a trail guide is key in meeting those goals. 

For a new initiative, clearly define goals and objectives, as well as pain points your organization wishes to address. This is critical to ensuring that the project’s sponsors and implementation team are all on the same page. Identifying specific benefits of completing your initiative can help people keep their “eyes on the prize” when the project feels like an uphill climb.

Timelines provide additional detail and direction—and demonstrate to decision makers that you have considered multiple facets of the project, including any constraints, resource limitations, or scheduling conflicts. Identifying best practices to incorporate throughout the initiative enhances the value of a business case proposition, and positions the organization for success. By leveraging lessons learned on previous projects, and planning for and mitigating risk, the organization will begin to clear the path for a successful endeavor. 

Don’t compromise on the right equipment

Hiking can be an expensive, time-consuming hobby. While the quality of your equipment and the accuracy of your maps are crucial, you can do things with limited resources if you’re careful. Taking the time to research and purchase the right equipment, (like the right hiking boots), keeps your fun expedition from becoming a tortuous slog. 

Similarly, in developing a business case for a new initiative, you need to make sure that you identify the right resources in the right areas. We all live with resource constraints of one sort or another. The process of identifying resources, particularly for funding and staffing the project, will lead to fewer surprises down the path. As many government employees know all too well, it is better to be thorough in the budget planning process than to return to authorizing sources for additional funding while midstream in a project. 

Consider your possible outcomes

You cannot be too singularly focused in the wild; weather conditions change quickly, unexpected opportunities reveal themselves, and being able to adapt quickly is absolutely necessary in order for everyone to come home safely. Sometimes, you should take the trail less traveled, rest in the random lean-to that you and your group stumble upon, or go for a refreshing dip in a lake. By focusing on more than just one single objective, it often leads to more enjoyable, safe, and successful excursions.

This type of outlook is necessary to build a business case for a new initiative. You may need to step back during your initial planning and consider the full impact of the process, including on those outside your organization. For example, you may begin to identify ways in which the initiative could benefit both internal and external stakeholders, and plan to move forward in a slightly new direction. Let’s say you’re building a business case for a new land management and permitting software system. Take time to consider that this system may benefit citizens, contractors, and other organizations that interact with your department. This new perspective can help you strengthen your business case. 

Expect teamwork

A group that doesn’t practice teamwork won’t last long in the wild. In order to facilitate and promote teamwork, it’s important to recognize the skills and contributions of each and every person. Some have a better sense of direction, while some can more easily start campfires. And if you find yourself fortunate enough to be joined by a truly experienced hiker, make sure that you listen to what they have to say.

Doing the hard work to present a business case for a new initiative may feel like a solitary action at times, but it’s not. Most likely, there are other people in your organization who see the value in the initiative. Recognize and utilize their skills in your planning. We also suggest working with an experienced advisor who can leverage best practices and lessons learned from similar projects. Their experience will help you anticipate potential resistance and develop and articulate the mitigation strategies necessary to gain support for your initiative.

If you have thoughts, concerns, or questions, contact our team. We love to discuss the potential and pitfalls of new initiatives, and can help prepare you to head out into the wild. We’d love to hear any parallels with hiking and wilderness adventuring that you have as well. Let us know! 

BerryDunn’s local government consulting team has the experience to lead technology planning initiatives and develop actionable plans that help you think strategically and improve service delivery. We partner with you, maintaining flexibility and open lines of communication to help ensure that your team has the resources it needs.

Our team has broad and deep experience partnering with local government clients across the country to modernize technology-based business transformation projects and the decision-making and planning efforts. Our expertise includes software system assessments/planning/procurement and implementation project management; operational, management, and staffing assessments; information security; cost allocation studies; and data management.  

Article
Into the wild: Building a business case for a new enterprise technology project

Read this if your organization is planning on upgrading or replacing an enterprise technology system.

It can be challenging and stressful to plan for technology initiatives, especially those that involve and impact every area of your organization. Common initiatives include software upgrades or replacements for:

  • Financial management, such as Enterprise Resource Planning (ERP) systems
  • Asset management systems
  • Electronic health records (EHR) systems
  • Permitting and inspections systems

Though the number of considerations when planning enterprise technology projects can be daunting, the greatest mistake you can make is not planning at all. By addressing just a few key areas, you can avoid some of the most common pitfalls, such as exceeding budget and schedule targets, experiencing scope creep, and losing buy-in among stakeholders. Here are some tips to help you navigate your next project:

Identify your IT project roles and resources

While most organizations understand the importance of identifying project stakeholder groups, it is often an afterthought. Defining these roles at the outset of your project helps you accurately estimate the work effort.

Your stakeholder groups may include:

  • An executive sponsor
  • A steering committee
  • A project manager
  • Functional leads
  • A technical team

Once you’ve established the necessary roles, you can begin reviewing your organization’s resources to determine the people who will be available to fill them. Planning for resource availability will help you avoid delays, minimize impact to regular business processes, and reduce the likelihood of burnout. But this plan won’t remain static—you can expect to make updates throughout the project.

Establish clear goals and objectives to keep your technology project on track

It’s important that an enterprise technology project has established goals and objectives statements. These statements will help inform decision-making, provide benchmarks for progress, and measure your project’s success. They can then be referenced when key stakeholders have differing perspectives on the direction to take with a pending decision. For example, if the objective of your project is to reduce paper-based processes, you may plan for additional computer workstations and focus technical resources on provisioning them. You’ll also be able to measure your success in the reduction of paper-based tasks.

Estimate your IT project budget accurately

Project funding is hardly ever overlooked, but can be complex with project budgets that are either underestimated or estimated without sufficient rationale to withstand approval processes and subsequent budget analysis. You may find that breaking down estimates to a lower level of detail helps address these challenges. Most technology projects incur costs in three key areas:

  • Vendor cost: This could include both one-time software implementation costs as well as recurring costs for maintenance and ongoing support.
  • Infrastructure cost: Consider the cost of any investments needed to support your project, such as data center hardware, networking components, or computing devices.
  • Supplemental resource cost: Don’t forget to include the cost of any additional resources needed for their specialized knowledge or to simply backfill project staff. This could include contracted resources or the additional cost of existing resources (i.e., overtime).

A good technology project budget also includes a contingency amount. This amount will depend on your organization’s standards, the relative level of confidence in your estimates, and the relative risk.

Anticipate the need for change management

Depending on the project, staff in many areas of your organization will be impacted by some level of change during a technology implementation. External stakeholders, such as vendors and the public, may also be affected. You can effectively manage this change by proactively identifying areas of likely change resistance and creating strategies to address them.

In any technology implementation, you will encounter change resistance you did not predict. Having strategies in place will help you react quickly and effectively. Some proven change management strategies include communicating throughout your project, involving stakeholders to get their buy-in, and helping ensure management has the right amount of information to share with their employees.

Maintain focus and stay flexible as you manage your IT project

Even with the most thought-out planning, unforeseen events and external factors may impact your technology project. Establish mechanisms to regularly and proactively monitor project status so that you can address material risks and issues before their impact to the project grows. Reacting to these items as they arise requires key project stakeholders to be flexible. Key stakeholders must recognize that new information does not necessarily mean previous decisions were made in error, and that it is better to adapt than to stick to the initial direction.

Whether you’re implementing an ERP, an EHR, or enterprise human resources or asset management systems, any enterprise technology project is a massive undertaking, involving significant investment and a coordinated effort with individuals across multiple areas of an organization. Common mistakes can be costly, but having a structured approach to your planning can help avoid pitfalls. Our experienced, objective advisors have worked with public and private organizations across the country to oversee large enterprise projects from inception to successful completion.

Contact our software consulting team with any questions.

Article
Planning for a successful enterprise technology project

Read this if you are a State Medicaid Director, State Medicaid Chief Information Officer, State Medicaid Project Manager, or State Procurement Officer—or if you work on a State Medicaid Enterprise System (MES) certification effort.

On October 24, 2019, the Centers for Medicaid and Medicare Services (CMS) published the Outcomes-Based Certification (OBC) guidance for the Electronic Visit Verification (EVV) module. Now, CMS is looking to bring the OBC process to the rest of the Medicaid Enterprise. 

The shift from a technical-focused certification to a business outcome-focused approach presents a unique opportunity for states as they begin re-procuring—and certifying—their Medicaid Enterprise Systems (MES).

Once you have defined the scope of your MES project—and know you need to undertake CMS certification—you need to ask “what’s next?” OBC can be a more efficient certification process to secure Federal Financial Participation (FFP).

What does OBC certification entail?

Rethinking certification in terms of business outcomes will require agencies to engage business and operations units at the earliest possible point of the project development process to define the program goals and define what a successful implementation is. One way to achieve this is to consider MES projects in three steps. 

Three steps to OBC evaluation

Step 1: Define outcomes

The first step in OBC planning seems easy enough: define outcomes. But what is an outcome? To answer that, it’s important to understand what an outcome isn’t. An outcome isn’t an activity. Instead, an outcome is the result of the activity. For example, the activity could be procuring an EVV solution. In this instance, an outcome could be that the state has increased the ability to detect fraud, waste, and abuse through increased visibility into the EVV solution.

Step 2: Determine measurements

The second step in the OBC process is to determine what to measure and how exactly you will measure it. Deciding what metrics will accurately capture progress toward the new outcomes may be intuitive and therefore easy to define. For example, a measure might simply be that each visit is captured within the EVV solution.

Increasing the ability to detect fraud, waste, and abuse could simply be measured by the number of cases referred to a Medicaid fraud unit or dollars recovered. However, you may not be able to easily measure that in the short-term. Instead, you may need to determine its measurement in terms of an intermediate goal, like increasing the number of claims checked against new data as a result of the new EVV solution. By increasing the number of checked claims, states can ensure that claims are not being paid for unverified visits. 

Step 3: Frequency and reporting

Finally, the state will need to determine how often to report to measure success. States will need to consider the nuances of their own Medicaid programs and how those nuances fit into CMS’ expectations, including what data is available at what intervals.

OBC represents a fundamental change to the certification process, but it’s important to highlight that OBC isn’t completely unfamiliar territory. There is likely to be some carry-over from the certification process as described in the Medicaid Enterprise Certification Toolkit (MECT) version 2.3. The current Medicaid Enterprise Certification (MEC) checklists serve as the foundation for a more abbreviated set of criteria. New evaluation criteria will look and feel like the criteria of old but are likely to be a fraction of the 741 criteria present in the MECT version 2.3.

OBC offers several benefits to states as you navigate federal certification requirements:

  1. You will experience a reduction in the amount of time, effort, and resources necessary to undertake the certification process. 
  2. OBC refocuses procurement in terms of enhancements to the program, not in new functions. Consequently, states will also be able to demonstrate the benefits that each module brings to the program which can be integral to stakeholder support of each module. 
  3. Early adoption of the OBC process can allow you to play a more proactive role in certification efforts.

Continue to check back for a series of our project case studies. Additionally, if you are considering an OBC effort and have questions, please contact our team. You can read the OBC guidance on the CMS website here
 

Article
Three steps to outcomes-based certification

Editors note: read this if you are a leader in an accountable care organization and interested in value-based contracting.

Accountable Care Organizations (ACOs) and value-based payments: an introduction

With the goal of slowing the rising cost of healthcare while maintaining the delivery of high-quality care, the Centers for Medicare & Medicaid Services (CMS) and private payers utilize a number of different provider payment models. The primary approach to address increasing healthcare costs has been to move away from fee-for-service payment models—which incentivize increasing the volume of care provided—to value-based payment models, which hold providers accountable for both the cost and quality of care they provide. The models have the potential to lead to reduced revenue for some providers, an outcome that can be avoided by successfully attracting larger patient populations. 

Value-based payment model options 

CMS has been a driver in this transition by moving physician reimbursement from being solely based on the Resource-Based Relative Value Scale (RBRVS) fee-for-service methodology to one that adds performance-based elements either through the Merit-based Incentive Payment System (MIPS) or Advanced Alternative Payment Models (Advanced APMs):

  • Providers that are MIPS eligible will have up to 9% of their RBRVS-based payments adjusted for four categories: quality, cost, clinical practice improvement activities, and promoting interoperability.
  • Providers in an Advanced APM may earn an incentive payment based on their participation in an innovative payment model―with more opportunity for incentive rewards being given to those who take downside financial risk. 

On the hospital side, CMS developed the Hospital Value-Based Purchasing (VBP) Program in order to move away from reimbursement based strictly on Diagnosis Related Groups (DRGs). The Hospital VBP Program rewards hospitals with incentive payments based on the quality of care they provide to Medicare beneficiaries. 

ACO value-based payment models are APMs that typically incorporate quality and the total cost of care for all services for a specific population, rather than just a specific clinical condition or care episode. Under the ACO model, CMS contracts with providers to assume increasing financial risk and reward opportunities while also being held accountable for their quality performance managing defined sub-populations they serve. These types of models are also employed by private payers.

How can ACOs succeed with payment models constantly changing?

ACOs should proceed with caution as they enter models with accountability for financial risk such as the newly finalized CMS Pathways to Success program and certain private payer commercial models. In order to be successful in any model, it is critical that ACOs have an adequate foundation in place and a provider network built to provide coordinated care. Some of the key elements for your success include:

  • Population data: Data for the ACO members that is a comprehensive record of their recent health utilization and spending history is critical.
  • Eligibility reporting: Require that eligibility files are provided on a monthly basis, and understand the way in which members are attributed or assigned. 
  • Claims data: Ensure accurate and complete claims data will be provided by payers monthly for the ACO members.
  • Financial/quality reporting: Ensure creation of infrastructure to generate reporting from the population data on a timely basis. Without timely reporting, the actual performance against benchmarks will not be known until it is too late to take any action.
  • Actuarial support: Validating spending targets and performance settlement should draw on the expertise of a qualified actuary.
  • Clinical documentation: Ambulatory clinical documentation categorizes patients based on the complexity of their diagnoses, which can be a predictor of future health care costs and used to identify at risk members for care management, disease management, and other programs. 
  • Population health management tools: Establish capabilities around population health management, specifically data aggregation and analysis that results in actionable recommendations
  • Audit capability: Verify the accuracy of payer financial and quality reports including the risk adjustment methodology.

Success in value-based payment models will require ACOs to understand changes to their population and quickly respond to address quality, utilization, and cost trends. 

WEBINAR
Demystifying Value-Based Contracting: Key Steps To Empower Your Organization

Want to learn more? Watch our value-based contracting webinar.

Article
Success in value-based payment for ACOs

Phew! We did it—The Medicaid Enterprise Systems Conference (MESC) 2019 is one for the books! And, it was a great one. Here is my perspective on objectives and themes that will guide our work for the year.

Monday 

My day started in the fog—I live on an island in Maine, take a boat to get into Portland, and taxi to the airport. Luckily, I got to Portland, and, ultimately Chicago, on time and ready to go. 

Public Sector Technology Group (PSTG) meeting

At the PSTG meetings, we reviewed activities from the previous year and did some planning for the coming year. Areas for consideration included:

  • Modernization Schedule
  • Module Definitions
  • Request for Proposal (RFP) Requirements
  • National Association of State Procurement Officers

Julie Boughn, Centers for Medicare and Medicaid (CMS) Director, Data and Systems Group (DSG) introduced her new boss, Karen Shields, who is the Deputy Director for the Center for Medicaid and CHIP Services (CMCS) within CMS. Karen shared her words of wisdom and encouragement with us, while Julie reminded us that being successful in our work is about the people. CMS also underscored the goal of speeding up delivery of service to the Medicaid program and asking ourselves: “What is the problem we are trying to resolve?” 

CMS’ “You be the State” officer workshop

Kudos to CMS for creating this open environment of knowledge sharing and gathering input.  Areas for discussion and input included:

  • APD Processes
  • Outcomes-Based Certification
  • Increasing and Enhancing Accountability

Tuesday
Opening Plenary

I was very touched by the Girls Inc. video describing the mission of Girls Inc. to inspire girls to be strong, smart, and bold. With organizations like this, and our awareness and action, I am optimistic for the future. Thank you to NESCSO for including this in their opening program.

John Doerr, author of Measure What Matters: OKRs: The Simple Idea that Drives 10x Growth and famed investor, shared his thoughts on how to create focus and efficiency in what we do. Julie’s interview with him was excellent, and I appreciated how John’s Objectives and Key Results (OKR) process prompted Julie to create objectives for what we are trying to do. The objectives Julie shared with us:

  • Improve the quality of our services for users and other stakeholders 
  • Ensure high-quality data is available to manage the program and improve policy making 
  • Improve procurement and delivery of Medicaid technology projects

Sessions

The sessions were well attended and although I can't detail each specific session I attended, I will note that I did enjoy using the app to guide me through the conference. NESCSO has uploaded the presentations. 

Auxiliary meetings

Whether formal or informal, meetings are one of the big values of the conference—relationships are key to everyone’s success, and meeting with attendees in one-on-one environments was incredibly productive. 

Poster session

The poster sessions were excellent. States are really into this event, and it is a great opportunity for the MESC community to engage with the states and see what is going on in the Medicaid Enterprise space.

Wednesday

Some memorable phrases heard in the sessions:

  • Knowledge is power only if you share it
  • We are in this together and want the same outcomes, so let’s share more
  • Two challenges to partnering projects—the two “P”s—are purchasing and personnel
  • Don’t let perfection be the enemy of the good
  • Small steps matter
  • Sharing data is harder than it needs to be—keep in mind the reason for what you are doing

Our evening social event was another great opportunity to connect with the community at MESC and the view of Chicago was beautiful.

Julie Boughn challenged us to set a goal (objective) in the coming year, and, along with it, to target some key results in connection with that goal. Here are some of her conference reflections:

  • Awesome
    • Several State Program and Policy leaders participated at MESC—impressed with Medicaid Director presence and participation
    • Smaller scoped projects are delivering in meeting the desired improved speed of delivery and quality
    • Increased program-technology alignment
  • Not so awesome
    • Pending state-vendor divorces
    • Burden of checklists and State Self-Assessments (SS-As)—will have something to report next year
    • There are still some attempts at very large, multi-year replacement projects—there is going to be a lot of scrutiny on gaining outcomes. Cannot wait five years to change something.

OKRs and request for states and vendors

  • Objective: Improve the quality of services for our users and other stakeholders
    • Key Result (KR): Through test results and audits, all States and CMS can state with precision, the overall accuracy of Medicaid eligibility systems.
    • KR: 100% of State electronic visit verification (EVV) systems are certified and producing annual performance data.
    • KR: 100% of States have used CMS-required testing guidance to produce testing results and evidence for their eligibility systems.
  • Objective: Ensure high-quality data is available to manage the program and improve policy making
    • KR: Transformed Medicaid Statistical Information System (T-MSIS) data is of sufficient quality that it is used to inform at least one key national Medicaid policy decision that all states have implemented.
    • KR:  Eliminate at least two state reporting requirements because T-MSIS data can be used instead.
    • KR: At least five states have used national or regional T-MSIS data to inform their own program oversite and/or policy-making decisions.
  • Objective: Improve how Medicaid technology projects are procured and delivered
    • KR: Draft standard language for outcomes metrics for at least four Medicaid business areas.
    • KR:  Five states make use of the standard NASPO Medicaid procurement.
    • KR:  CMS reviews of RFPs and contracts using NASPO vehicle are completed within 10 business days.
    • KR:  Four states test using small incremental development phases for delivery of services.
  • Request: Within 30 days, states/vendors will identify at least one action to take to help us achieve at least one of the KRs within the next two years.

Last thoughts

There is a lot to digest, and I am energized to carry on. There are many follow-up tasks we all have on our list. Before we know it, we’ll be back at next year’s MESC and can check in on how we are doing with the action we have chosen to help meet CMS’s requirements. See you in Boston!

Article
MESC 2019―Reflections and Daily Recap

As the Project Management Body of Knowledge® (PMBOK®) explains, organizations fall along a structure and reporting spectrum. On one end of this spectrum are functional organizations, in which people report to their functional managers. (For example, Finance staff report to a Finance director.) On the other end of this spectrum are projectized organizations, in which people report to a project manager. Toward the middle of the spectrum lie hybrid—or matrix—organizations, in which reporting lines are fairly complex; e.g., people may report to both functional managers and project managers. 

Problem: Weak Matrix Medicaid System Vendors

This brings us to weak matrix organizations, in which functional managers have more authority than project managers. Many Medicaid system vendors happen to fall into the weak matrix category, for a number of different reasons. Yet the primary factor is the volume and duration of operational work—such as provider enrollment, claims processing, and member enrollment—that Medicaid system vendors perform once they exit the design, development, and implementation (DDI) phase.

This work spans functional areas, which can muddy the reporting waters. Without strong and clear reporting lines to project managers, project success can be seriously (and negatively) affected if the priorities of the functional leads are not aligned with those of the project. And when a weak matrix Medicaid system vendor enters a multi-vendor environment in which it is tasked with implementing a system that will serve multiple departments and bureaus within a state government, the reporting waters can become even muddier.


Solution: Using a Project Management Office (PMO) Vendor

Conversely, consulting firms that provide Project Management Office (PMO) services to government agencies tend to be strong matrix organizations, in which project managers have more authority over project teams and can quickly reallocate team members to address the myriad of issues that arise on complex, multi-year projects to help ensure project success. PMOs are also typically experienced at creating and running project governance structures and can add significant value in system implementation-related work across government agencies.

Additional benefits of a utilizing a PMO vendor include consistent, centralized reporting across your portfolio of projects and the ability to quickly onboard subject matter expertise to meet program and project needs. 
For more in-depth information on the benefits of using a PMO on state Medicaid projects, stay tuned for my second blog in this series. In the meantime, feel free to send your PMO- or Medicaid-related questions to me
 

Article
The power of the PMO: Fixing the weak matrix

Law enforcement, courts, prosecutors, and corrections personnel provide many complex, seemingly limitless services. Seemingly is the key word here, for in reality these personnel provide a set number of incredibly important services.

Therefore, it should surprise no one that justice and public safety (J&PS) IT departments should also provide a well-defined set of services. However, these departments are often viewed as parking lots for all technical problems. The disconnect between IT and other J&PS business units often stems from differences in organizational culture and structure, and differing department objectives and goals. As a result, J&PS organizations often experience misperception between business units and IT. The solution to this disconnect and misperception? Defining IT department services.

The benefits of defined IT services

  1. Increased business customer satisfaction. Once IT services align with customer needs, and expectations are established (e.g., service costs and service level agreements), customers can expect to receive the services they agreed to, and the IT department can align staff and skill levels to successfully meet those needs.
  2. Improved IT personnel morale. With clear definition of the services they provide to their customers, including clearly defined processes for customers to request those services, IT personnel will no longer be subject to “rogue” questions or requests, and customers won’t be inclined to circumvent the process. This decreases IT staff stress and enables them to focus on their roles in providing the defined services. 
  3. Better alignment of IT services to organizational needs. Through collaboration between the business and IT organizations, the business is able to clearly articulate the IT services that are, and aren’t, required. IT can help define realistic service levels and associated services costs, and can align IT staff and skills to the agreed-upon services. This results in increased IT effectiveness and reduced confusion regarding what services the business can expect from IT.
  4. More collaboration between IT and the organization. The collaboration between the IT and business units in defining services results in an enhanced relationship between these organizations, increasing trust and clarifying expectations. This collaborative model continues as the services required by the business evolve, and IT evolves to support them.
  5. Reduced costs. J&PS organizations that fail to strategically align IT and business strategy face increasing financial costs, as the organization is unable to invest IT dollars wisely. When a business doesn’t see IT as an enabler of business strategy, IT is no longer the provider of choice—and ultimately risks IT services being outsourced to a third-party vendor.

Next steps
Once a J&PS IT department defines its services to support business needs, it then can align the IT staffing model (i.e., numbers of staff, skill sets, roles and responsibilities), and continue to collaborate with the business to identify evolving services, as well as remove services that are no longer relevant. Contact us for help with this next step and other IT strategies and tactics for justice and public safety organizations.

Article
The definition of success: J&PS IT departments must define services