Considerations for
outcomes-based
certification

09.22.20

Read this if you are a State Medicaid Director, State Medicaid Chief Information Officer, State Medicaid Project Manager, or State Procurement Officer—or if you work on a State Medicaid Enterprise System (MES) certification or modernization efforts.

You can listen to the companion podcast to this article now:


Over the last two years, the Centers for Medicare and Medicaid Services (CMS) has undertaken an effort to streamline Medicaid Enterprise System (MES) certification. During this time, we have been fortunate enough to have been a trusted partner in several states working to evolve the certification process. Through this collaboration with CMS and state partners, we have been in front of recent certification trends. 

What is outcomes-based certification (OBC)? 

OBC (or streamlined modular certification) is a fascinating evolution in MES certification. OBC represents a fundamental rethinking of certification and how we measure the success of system implementation and modernization efforts. The prior certification approach, as many know it, is centrally focused on technical capability, answering the question, “Can the system perform the required functions?” 

OBC represents a shift away from this technical certification and toward business process improvement, instead answering the question, “How is this new technology enhancing the Medicaid program?” Or, put differently, “Is this new technology helping my Medicaid program achieve its desired outcomes?” 

What are the key differences between the MECT and OBC? 

To understand the differences, we have to first talk about what isn’t changing. Technical criteria still exist, but only so far as CMS is confirming compliance with core regulatory and statutory requirements—including CMS’ Standards and Conditions. That’s about the extent of the similarities. In addition to pivoting to business process improvement, we understand that CMS is looking to generalize certification under this new approach, meaning that we wouldn’t see the same Medicaid Information Technology Architecture (MITA)-tied checklists like Provider Management, or Decision Support Systems. Instead, we might expect more generalized guidance that would allow for a more tailored certification. 

Additionally, OBC introduces outcomes statements which serve as the guiding principles for certification. Everything, including the technical criteria, roll-up into an outcome statement. This type of roll up might actually feel familiar, as we see a similar structure in how Medicaid Enterprise Certification Toolkit (MECT) criteria rolled up into critical success factors. 

The biggest difference, and the one states need to understand above all else, is the use of key performance indicators (KPIs). These KPIs aren’t just point-in-time certification measures, they are expected to be reported against regularly—say, quarterly—in order to maintain enhanced funding. Additionally, it’s likely that each criterion will have an associated KPI, meaning that states will continue to be accountable to these criteria long after the Certification Final Review. 

How are KPIs developed? 

We’ve seen KPIs developed in two ways. For more strategic, high level KPIs, CMS develops a baseline set of KPIs heading into collaborating with a state on an OBC effort. In these instances, CMS has historically sought input on whether those KPIs are reasonable and can be easily reported against. CMS articulates what it wants to measure conceptually, and works with a state to ensure that the KPI achieves that within the scope of a state’s program.  

For KPIs specific to a state’s Medicaid program, CMS engages with states to draft new KPIs. In these instances, we’ve seen CMS partner with states to understand the business need for the new system, how it fits into the Medicaid enterprise, and what the desired outcome of the particular approach is. 

What should states consider as they plan for MES procurements? 

While there might be many considerations pertaining to OBC and procurements, two are integral to success. First—as CMS noted in the virtual MESC session earlier this month—engage CMS at the idea stage of a project. Experience tells us that CMS is ready and willing to collaborate with—and incorporate the needs of—states that engage at this idea stage. That early collaboration will help shape the certification path. 

Second, consider program outcomes when conceptualizing the procurement. Keep these outcomes central to base procurement language, requirements, and service level agreements. We’re likely to see the need for states to incorporate these outcomes into contracts. 

What does this mean for MES modularity and scalability? 

Based on our current understanding of the generalization of certification, states, and subsequently the industry at large, will continue to refine what modularity means based on Medicaid program needs. Scalability represents an interesting question, as we’ve seen OBC scaled horizontally across smaller, discrete business areas like pharmacy or provider management. Now we’re seeing the beginnings of vertical scaling of a more streamlined certification approach to larger components of the enterprise, such as financial management and claims processing. 

The certification landscape is seemingly changing weekly as states wait eagerly for CMS’ next guidance issuances. Please continue to check back for in-depth analyses and OBC success stories. Additionally, if you are considering an OBC effort and have questions, please contact our Medicaid Consulting team

Related Industries

Related Professionals

Principals

Read this if you are a State Medicaid Director, State Medicaid Chief Information Officer, State Medicaid Project Manager, or State Procurement Officer—or if you work on a State Medicaid Enterprise System (MES) certification effort.

Measuring performance of Medicaid Enterprise Systems (MES) is emerging as the next logical step in moving Medicaid programs toward modularity. As CMS continues to refine and implement outcomes-based modular certification, it is critical that states adapt to this next step in order to continue to meet CMS funding requirements.

This measurement, in terms of program outcomes, presents a unique set of challenges, many of which a state may not have considered before. A significant challenge is determining how and where to begin measuring program outcomes―to meet it, states can leverage a trusted, independent partner as they undertake an outcomes-based effort.

Outcomes-based planning can be thought of as a three-step process. First, and perhaps most fundamental, is to define outcomes. Second, you need to determine what measurements will demonstrate progress toward achieving those outcomes. And the final step is to create reporting measurements and their frequency. Your independent partner can help you answer these critical questions and meet CMS requirements efficiently by objectively guiding you toward realizing your goals.

  1. Defining Outcomes
    When defining an outcome, it is important to understand what it is and what it isn’t. An outcome is a benefit or added value to the Medicaid program. It is not an output, which is a new or enhanced function of a new MES module. An output is the product that supports the outcome. For example, the functionality of a new Program Integrity (PI) module represents an output. The outcome of the new PI module could be that the Medicaid program continuously improves based on data available because of the new PI module. Some outcomes may be intuitive or obvious. Others may not be as easy to articulate. Regardless, you need to direct the focus of your state and solution vendor teams on the outcome to uncover what the underlying goal of your Medicaid program is.
     
  2. Determining Measurements
    The second step is to measure progress. Well-defined Key Performance Indicators (KPIs) will accurately capture progress toward these newly defined outcomes. Your independent partner can play a key role by posing questions to help ensure the measurements you consider align with CMS’ goals and objectives. Additionally, they can validate the quality of the data to ensure accuracy of all measurements, again helping to meet CMS requirements.
     
  3. Reporting Measurements
    Finally, your state must decide how―and how often―to report on outcomes-based measurements. Your independent partner can collaborate with both your state and CMS by facilitating conversations to determine how you should report, based on a Medicaid program’s nuances and CMS’ goals. This can help ensure the measurements (and support information) you present to CMS are useful and reliable, giving you the best chance for attaining modular certification.

Are you considering an outcomes-based CMS modular certification, or do you have questions about how to best leverage an independent partner to succeed with your outcomes-based modular certification effort? BerryDunn’s extensive experience as an independent IV&V and Project Management Office (PMO) partner includes the first pilot outcomes-based certification effort with CMS. Please visit our IV&V and certification experts at our booth at MESC 2019 or contact our team now.

Article
Three steps to measure Medicaid Enterprise Systems outcomes

Here we go again! With the 2018 Medicaid Enterprise System Conference (MESC) underway, we have another Medicaid Enterprise Certification Toolkit (MECT) Release. On July 31, 2018, the Centers for Medicare and Medicaid Services (CMS) issued the MECT Version 2.3. Historically, CMS has updated their certification toolkit and lifecycles iteratively on a near yearly basis. With increasingly rapid technological advances and initiatives, CMS’ iterative releases of the MECT are provided in an effort to stay current with federal regulations and industry priorities.

Last year’s MECT update (version 2.2) brought a slew of certification checklist updates, with somewhat comprehensive changes to the certification criteria. Although there were still a few updates to the checklists, this year’s release focused more on updating the required documentation and processes, than revamping the checklists.

Many states are beginning work on Medicaid Information Management System (MMIS) modular procurements, to replace outdated or poorly functioning enterprise and legacy systems. States are continuing to conform the certification process to modern procurements; however, there is still gray area and differences in approach amongst states across regions. Certification teams eagerly await MECT updates as the Toolkit becomes more aligned with new modular procurements. Will MECT 2.3 accomplish that? Let’s look over some of the core certification elements, and consider the impacts. Are we collectively there yet, or do we still need to continue growing through the modular implementation pains?

CMS Certification Checklist Updates

The most impactful update to the certification checklist includes the comprehensive removal of the Medicaid Information Technology Architecture (MITA) Business Area Checklist Set. This removal is a nod to the ever changing Medicaid environment, where MITA-guided procurements are being replaced by modular business function mappings. Additional changes to the checklists include:

  • Provider and Pharmacy checklists now include guidance tabs
  • Program Integrity checklist now includes 6 additional certification criteria for Electronic Visit Verification (EVV) certifications
  • Criterion TA.SP.75 was removed from the Access and Delivery checklists, and added to the Programmatic checklist in the IV&V Progress Report
  • Two criteria, TA.DC.5 and TA.DC.6, were removed from the Intermediary and Interface checklists

Appendix D: MMIS IV&V Progress Report Updates

  • Section instructions have been updated for all sections to include more detail and guidance

  • General Information now includes fields for submitter company name and if/when the Project Partnership Understanding (PPU) document was sent to CMS. Activity 1 Consult Date and RFP release fields have been removed

  • Summary of Project Progress and Status (formerly Executive Summary) instructions now direct the submitter to provide project-wide information, not just planned modules and/or seeking a Milestone Review

  • Budget & Schedule Metrics (formerly Life Cycle Status and Schedule) now includes the ability to identify project and module state-specific metrics to report variance

  • Life Cycle Status and Schedule replaced the MITA-Aligned Modules with Additional Modules to allow states to identify up to five (5) custom modules

  • Risks and Recommendations instructions have been updated to direct the submitter to include project-wide information, not just planned modules and/or seeking a Milestone Review

  • Programmatic Checklist now includes a “partially meets” assessment option

Required Artifacts (Appendix B) Updates

  • One new artifact: New Medicare Card Program’s (NMCP) State Medicaid Agency Readiness Report (R1, R2, and R3)

  • No removed artifacts

  • One artifact with updates: Production Screenshots, Reports, and Data (R3)

Updates to the MECT Appendices

  • Multiple updates to Appendix H: PPU Template, including updates to the section names, removal of multiple sections, and additional guidance on the use of this document

  • Addition of Appendix K: Map of MITA Business Areas to Criteria (This document maps all of the MECT checklist criteria outside of the five core checklists to their appropriate MITA business area)

  • Addition of Appendix L: Milestone Review Preparation Guide (This document explains how milestone reviews are conducted and how states can readily prepare for milestone reviews)

Additional Updates

  • Updates to the Medicaid Enterprise Life Cycle (MECL)

  • Updates to the MECL and At-a-Glance Sheets

  • Additional recommendations for Independent Verification and Validation (IV&V) vendors, including when and how IV&V can provide advice to states

  • Minor updates to additional MECT appendices

From initial assessment of the MECT 2.3 release, it is clear that CMS continues to take strides to align the certification process to support our new modular Medicaid enterprise world. Keep in mind that MECT 2.3 is the latest round of a continuous cycle. Though it will likely not be the answer to all states’ issues and needs, this release does make great strides in adapting to the ever-changing Medicaid landscape. As we reported last year with the release of MECT 2.2, CMS continues to foster and support an environment for states to better align their procurement and certification efforts with the new modular enterprise industry.

Article
MECT 2.3: More guidance, more documentation

Read this if you are a State Medicaid Director, State Medicaid Chief Information Officer, State Medicaid Project Manager, or State Procurement Officer.

As CMS moves away from the monolithic Medicaid Management Information System (MMIS) toward an outcomes-based approach that includes a modular Medicaid Enterprise System (MES), there is now more emphasis on system integration (SI). 

In the August 16, 2016 letter, State Medicaid Director (SMD) #16-010, CMS clarified the role of the system integrator (SI) by stating:

CMS envisions a discrete role for the system integrator (SI) in each state, with specific focus on ensuring the integrity and interoperability of the Medicaid IT architecture and cohesiveness of the various modules incorporated into the Medicaid enterprise. 

While the importance of the SI role is apparent, not all states have the resources to build the SI capability within their own organizations. Some state Medicaid IT teams try to solve this by delegating management roles to vendors or contractors. This approach has various risks. A state could lose:

  • Institutional knowledge, as vendors and contractors transition off the project
  • Control of governance, oversight, and leadership
  • The ability to enforce contractual requirements across each vendor, especially the SI

In addition, the ramifications of loss of state accountability can have wide-reaching implementation, operational, and financial impacts, including:

  • The loss of timely decision making, causing projects to fall behind schedule
  • State-specific policy needs not being met, impacting how the MMIS functions in production 
  • Poor integration into the state-specific Operation and Maintenance (O&M) support model, increasing the state’s portion of long-term O&M costs
  • Inefficient and ineffective contract management of each module vendor and contractor (including the SI), possibly leading to unneeded change requests and cost overruns
  • Lack of coordination with the state’s business or IT roadmap initiatives (i.e., system consolidation or cloud migration vendor/approach), possibly leading to rework and missed opportunities to reduce cost or improve interoperability 

Apply strong governance and IV&V to tackle risks

Because the SI vendor is responsible for the integration of multiple modules across multiple vendors, you may consider delegating oversight of module vendors to the SI vendor. 

The major benefit states get from using the SI vendor is efficiency. Having your vendor as the central point of contact can quickly resolve technical issues, while allowing easy coordination of project tasks across each module vendor on a continual basis. 

If you choose to use a vendor for the SI role, establish safeguards and governance to make sure your goals are being met:

  • Build a project-specific governance model (executive committee [EC]) to oversee the vendors and the project
  • Establish a regular meeting cadence for the EC to allow for status updates on milestones and discuss significant project risks and issues 
  • Allocate state resources into project leadership roles (i.e., project manager, vendor contract manager, security lead, testing/Quality Assurance lead, etc.)
  • Conduct regular (weekly) SI status meetings to track progress and address risks and issues 

You also need a strong, involved governance structure that includes teams of state senior leadership, state program managers, SI vendor engagement/contract managers, and Independent Verification and Validation (IV&V) vendors. By definition, one responsibility of IV&V is to identify and monitor project risks and issues that could arise from a lack of independence. 

Your governance teams can debate decisions and disputes, risks and issues, and federal compliance issues with their vendors to define direction and action plans. However, a state representative within these teams should always make the final management decisions, approve all SI scope items and changes, and approve all contractual deliverables from each vendor or contractor.

Your state staff (business and IT) provides project management decision, business needs, requirements (functional and non-functional), policy guidance, and continuity as the vendors and/or contractors change over time. 

The conclusion? In order to be successful, you must retain certain controls and expertise to deploy and operate a successful MMIS system. Our consultants understand the need to keep you in control of managing key portions of implementation projects/programs and operational tasks. If you have questions, please contact BerryDunn’s Medicaid team.  
 

Article
Risks when using vendors to manage Medicaid system implementation projects

Read this if you are a state Medicaid Director, State Medicaid Chief Information Officer, State Medicaid Project Manager, or State Procurement Officer.

When I was growing up, my dad would leave the Bureau of Motor Vehicles or hang up the phone after talking with the phone company and say sarcastically, “I’m from the government (or the phone company) and I’m here to help you. Yeah, right.” I could hear the frustration in his voice. As I’ve gotten older, I understand the hassle of dealing with bureaucracy, where the red tape can make things more difficult than they need to be, and where customers don’t come first. It doesn’t have to be that way.

In my role performing Independent Verification and Validation (IV&V) at BerryDunn, I hear the same skepticism in the voices of some of my clients. I can hear them thinking, “Let me get this straight… I’m spending millions of dollars to replace my old Medicaid Management Information System (MMIS), and the Centers for Medicare and Medicaid Services (CMS) says I have to hire an IV&V consultant to show me what I am doing wrong? I don’t even control the contract. You’re here to help me? Yeah, right.” Here are some things to assuage your doubt. 

Independent IV&V―what they should do for you and your organization

An independent IV&V partner that is invested in your project’s success can:

  • Enhance your system implementation to help you achieve compliance
  • Help you share best practice experience in the context of your organization’s culture to improve efficiency in other areas
  • Assist you in improving your efficiency and timeliness with project management capabilities.

Even though IV&V vendors are federally mandated from CMS, your IV&V vendor should also be a trusted partner and advisor, so you can achieve compliance, improve efficiency, and save time and effort. 

Not all IV&V vendors are equal. Important things to consider:

Independence―independent vendors are a good place to start, as they are solely focused on your project’s success. They should not be selling you software or other added services, push vendor affiliations, or rubber stamp CMS, nor the state. You need a non-biased sounding board, a partner willing to share lessons learned from experience that will help your organization improve.

Well-rounded perspective―IV&V vendors should approach your project from all perspectives. A successful implementation relies on knowledge of Medicaid policy and processes, Medicaid operations and financing, CMS certification, and project management.

“Hello, we are IV&V from BerryDunn, and we are here to help.”

BerryDunn offers teams that consist of members with complementary skills to ensure all aspects of your project receive expert attention. Have questions about IV&V? Contact our team.
 

Article
We're IV&V and we are here to help you improve your Medicaid organization

As the Project Management Body of Knowledge® (PMBOK®) explains, organizations fall along a structure and reporting spectrum. On one end of this spectrum are functional organizations, in which people report to their functional managers. (For example, Finance staff report to a Finance director.) On the other end of this spectrum are projectized organizations, in which people report to a project manager. Toward the middle of the spectrum lie hybrid—or matrix—organizations, in which reporting lines are fairly complex; e.g., people may report to both functional managers and project managers. 

Problem: Weak Matrix Medicaid System Vendors

This brings us to weak matrix organizations, in which functional managers have more authority than project managers. Many Medicaid system vendors happen to fall into the weak matrix category, for a number of different reasons. Yet the primary factor is the volume and duration of operational work—such as provider enrollment, claims processing, and member enrollment—that Medicaid system vendors perform once they exit the design, development, and implementation (DDI) phase.

This work spans functional areas, which can muddy the reporting waters. Without strong and clear reporting lines to project managers, project success can be seriously (and negatively) affected if the priorities of the functional leads are not aligned with those of the project. And when a weak matrix Medicaid system vendor enters a multi-vendor environment in which it is tasked with implementing a system that will serve multiple departments and bureaus within a state government, the reporting waters can become even muddier.


Solution: Using a Project Management Office (PMO) Vendor

Conversely, consulting firms that provide Project Management Office (PMO) services to government agencies tend to be strong matrix organizations, in which project managers have more authority over project teams and can quickly reallocate team members to address the myriad of issues that arise on complex, multi-year projects to help ensure project success. PMOs are also typically experienced at creating and running project governance structures and can add significant value in system implementation-related work across government agencies.

Additional benefits of a utilizing a PMO vendor include consistent, centralized reporting across your portfolio of projects and the ability to quickly onboard subject matter expertise to meet program and project needs. 
For more in-depth information on the benefits of using a PMO on state Medicaid projects, stay tuned for my second blog in this series. In the meantime, feel free to send your PMO- or Medicaid-related questions to me
 

Article
The power of the PMO: Fixing the weak matrix

As your organization works to modernize and improve your Medicaid Enterprise System (MES), are you using independent verification and validation (IV&V) to your advantage? Does your relationship with your IV&V provider help you identify high-risk project areas early, or provide you with an objective view of the progress and quality of your MES modernization initiative? Maybe your experience hasn’t shown you the benefits of IV&V. 

If so, as CMS focuses on quality outcomes, there may be opportunities for you to leverage IV&V in a way that can help advance your MES to increase the likelihood of desired outcomes for your clients. 

According to 45 Code of Federal Regulations (CFR) § 95.626, IV&V may be required for Advanced Planning Document (APD) projects that meet specific criteria. That said, what is the intended role and benefit of IV&V? 

To begin, let’s look at the meaning of “verification” and “validation.” The Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard for Software Verification and Validation (1012-1998) defines verification as, “confirmation of objective evidence that the particular requirements for a specific intended use are fulfilled.” Validation is “confirmation of objective evidence that specified requirements have been fulfilled.” 

Simply put, verification and validation ensure the right product is built, and the product is built right. 
As an independent third party, IV&V should not be influenced by any vendor or software application. This objectivity means IV&V’s perspective is focused on benefiting your organization. This support includes: 

  • Project management processes and best practices support to help increase probability of project success
  • Collaboration with you, your vendors, and stakeholders to help foster a positive and efficient environment for team members to interact 
  • Early identification of high-risk project areas to minimize impact to schedule, cost, quality, and scope 
  • Objective examination of project health in order for project sponsors, including the federal government, to address project issues
  • Impartial analysis of project health that allows state management to make informed decisions 
  • Unbiased visibility into the progress and quality of the project effort to increase customer satisfaction and reduce the risk and cost of rework
  • Reduction of errors in delivered products to help increase productivity of staff, resulting in a more efficient MES 

Based on our experience, when a trusted relationship exists between state governments and IV&V, an open, collaborative dialogue of project challenges—in a non-threatening manner—allows for early resolution of risks. This leads to improved quality of MES outcomes.    

Is your IV&V provider helping you advance the quality of your MES? Contact our team.

Article
Leveraging IV&V to achieve quality outcomes

Editor’s note: If you are a state government CFO, CIO, project or program manager, this blog is for you.

What is the difference in how government organizations procure agile vs. non-agile information technology (IT) services? (Learn more about agile here).

In each case, they typically follow five stages through the process as shown in Figure A:
 

Figure A: Overview of Procurement Process for Agile vs. Non-Agile IT Services

However, there are differences in how these stages are carried out if procuring agile vs. non-agile IT services. 

Unfortunately, most government organizations are unaware of these differences, which could result in unsuccessful procurements and ultimately not meeting your project’s needs and expectations. 
This blog series will illustrate how to strategically adjust the standard stages outlined in Figure A to successfully procure agile IT services.

Stage 1: Plan project
In Stage 1, you define the scope of the project by identifying what your organization wants, needs, and can achieve within the available timeframe and budget. You then determine the project’s objectives while strategically considering their impact on your organization before developing the RFP. Figure B summarizes the key differences between the impacts of agile vs. non-agile services to consider in this stage.


Figure B: Plan Project for Agile vs. Non-Agile IT Services

The nuances of planning for agile services reflect an organization’s readiness for a culture shift to a continuous process of development and deployment of software and system updates. 

Stage 2: Draft RFP
In Stage 2, as part of RFP drafting, define the necessary enhancements and functionality needed to achieve the project objectives determined in Stage 1. You then translate these enhancements and functionalities into business requirements. Requirement types might include business needs as functionality, services, staffing, deliverables, technology, and performance standards. Figure C summarizes the key differences between drafting the RFP for a project procuring agile vs. non-agile services.


Figure C: Draft RFP for Agile vs. Non-Agile IT Services

In drafting the RFP, the scope of work emphasizes expectations for how your team and the vendor team will work together, the terms of how progress will be monitored, and the description of requirements for agile tools and methods.

Stage 3: Issue RFP
In Stage 3, issue the RFP to the vendor community, answer vendor questions, post amendments, and manage the procurement schedule. Since this stage of the process requires you to comply with your organization’s purchasing and procurement rules, Figure D illustrates very little difference between issuing an RFP for a project procuring agile or non-agile services.


Figure D: Issue RFP for Agile vs. Non-Agile IT Services 

Stage 4: Review proposals
In Stage 4, you evaluate vendor proposals against the RFP’s requirements and project objectives to determine the best proposal response. Figure E summarizes the key differences in reviewing proposals for a project that is procuring agile vs. non-agile services.


Figure E: Reviewing Proposals for Agile vs. Non-Agile IT Services 

Having appropriate evaluation priorities and scoring weights that align with how agile services are delivered should not be under-emphasized. 

Stage 5: Award and implement contract
In Stage 5, you award and implement the contract with the best vendor proposal identified during Stage 4. Figure F summarizes the key differences in awarding and implementing the contract for agile vs. non-agile services.


Figure F:  Award and Implement Contract for Agile vs. Non-Agile Services 

Due to the iterative and interactive requirements of agile, it is necessary to have robust and frequent collaboration among program teams, executives, sponsors, and the vendor to succeed in your agile project delivery.

What’s next?
The blog posts in this series will explain step-by-step how to procure agile services through the five stages, and at the series conclusion, your organization will better understand how to successfully procure and implement agile services. If you have questions or comments, please contact our team.  

Article
Procuring agile vs. non-agile projects in five stages: An overview

Truly effective preventive health interventions require starting early, as evidenced by the large body of research and the growing federal focus on the role of Medicaid in addressing Social Determinants of Health (SDoH) and Adverse Childhood Experiences (ACEs).

Focusing on early identification of SDoH and ACEs, CMS recently announced its Integrated Care for Kids (InCK) model and will release the related Notice of Funding Opportunity this fall.

CMS describes InCK as a child-centered approach that uses community-based service delivery and alternative payment models (APMs) to improve and expand early identification, prevention, and treatment of priority health concerns, including behavioral health issues. The model’s goals are to improve child health, reduce avoidable inpatient stays and out-of-home placement, and create sustainable APMs. Such APMs would align payment with care quality and support provider/payer accountability for improved child health outcomes by using care coordination, case management, and mobile crisis response and stabilization services.

State Medicaid agencies have many things to consider when evaluating this funding opportunity. Building on current efforts and innovations, building or leveraging strong partnerships with community organizations, incentivizing evidence-based interventions, and creating risk stratification of the target population are critical parts of the InCK model. Here are three additional areas to consider:

1. Data. States will need information for early identification of children in the target population. State agencies?like housing, justice, child welfare, education, and public health have this information?and external organizations—such as childcare, faith-based, and recreation groups—are also good sources of early identification. It is immensely complicated to access data from these disparate sources. State Medicaid agencies will be required to support local implementation by providing population-level data for the targeted geographic service area.

  • Data collection challenges include a lack of standardized measures for SDoH and ACEs, common data field definitions, or consistent approaches to data classification; security and privacy of protected health information; and IT development costs.
  • Data-sharing agreements with internal and external sources will be critical for state Medicaid agencies to develop, while remaining mindful of protected health information regulations.
  • Once data-sharing agreements are in place, these disparate data sources, with differing file structures and nomenclature, will require integration. The integrated data must then be able to identify and risk-stratify the target population.

For any evaluative approach or any APM to be effective, clear quality and outcome measures must be developed and adopted across all relevant partner organizations.

2. Eligibility. Reliable, integrated eligibility and enrollment systems are crucial points of identification and make it easier to connect to needed services.

  • Applicants for one-benefit programs should be screened for eligibility for all programs they may need to achieve positive health outcomes.
  • Any agency at which potential beneficiaries appear should also have enrollment capability, so it is easier to access services.

3. Payment models. State Medicaid agencies may cover case management services and/or targeted case management as well as health homes; leverage Early and Periodic Screening, Diagnostic, and Treatment (EPSDT) services; and modify managed care organization contract language to encourage, incent, and in some cases, require services related to the InCK model and SDoH. Value-based payment models, already under exploration in numerous states, include four basic approaches:

  • Pay for performance—provider payments are tied directly to specific quality or efficiency indicators, including health outcomes under the provider organization’s control. 
  • Shared savings/risk—some portion of the organization’s compensation depends on the managed care entity achieving cost savings for the targeted patient population, while realizing specific health outcomes or quality improvement.
  • Pay for success—payment is dependent upon achieving desired outcomes rather than underlying services.
  • Capitated or bundled payments—managed care entities pay an upfront per member per month lump sum payment to an organization for community care coordination activities and link that with fee-for-service reimbursement for delivering value-added services.

By focusing on upstream prevention, comprehensive service delivery, and alternative payment models, the InCK model is a promising vehicle to positively impact children’s health. Though its components require significant thought, strategy, coordination, and commitment from state Medicaid agencies and partners, there are early innovators providing helpful examples and entities with vast Section 1115 waiver development and Medicaid innovation experience available to assist.

As state Medicaid agencies develop and implement primary and secondary prevention, cost savings can be achieved while meaningful improvements are made in children’s lives.

Article
Three factors state medicaid agencies should consider when applying for InCK funding

A year ago, CMS released the Medicaid Enterprise Certification Toolkit (MECT) 2.1: a new Medicaid Management Information Systems (MMIS) Certification approach that aligns milestone reviews with the systems development life cycle (SDLC) to provide feedback at key points throughout design, development, and implementation (DDI).

The MECT (recently updated to version 2.2) incorporates lessons learned from pilot certifications in several states, including the successful West Virginia pilot that BerryDunn supported. MECT updates have a direct impact on E&E systems—an impact that may increase in the near future. Here is what you need to know:         

Then: Initial Release

In February 2017, CMS introduced six Eligibility & Enrollment (E&E) checklists. Five were leveraged from the MECT, while the sixth checklist contained unique E&E system functionality criteria and provided a new E&E SDLC that—like the MECT—depicted three milestone reviews and increased the Independent Verification and Validation (IV&V) vendor’s involvement in the checklists completion process.

Now: Getting Started

Completing the E&E checklists will help states ensure the integrity of their E&E systems and help CMS guide future funding. This exercise is no easy task, particularly when a project is already in progress. Completion of the E&E checklists involves many stakeholders, including:

  • The state (likely more than one agency)
  • CMS
  • IV&V
  • Project Management Office (PMO)
  • System vendor(s)

As with any new processes, there are challenges with E&E checklists completion. Some early challenges include:

  • Completing the E&E checklists with limited state project resources
  • Determining applicable criteria for E&E systems, especially for checklists shared with the MMIS
  • Identifying and collecting evidence for iterative projects where criteria may not fall cleanly into one milestone review phase
  • Completing the E&E checklists with limited state project resources
  • Working with the system vendor(s) to produce evidence

What’s Next?

Additionally, working with system vendors may prove tricky for projects that already have contracts with E&E vendors, as E&E systems are not currently subject to certification (unlike the MMIS). This may lead to instances where E&E vendors are not contractually obligated to provide the evidence that would best satisfy CMS criteria. To handle this and other challenges, states should communicate risks and issues to CMS and work together to resolve or mitigate them.

As CMS partners with states to implement the E&E checklists, some questions are expected to be asked. For example, how much information can be leveraged from the MECT, and how much of the checklists completion process must be E&E-specific? Might certification be required in the near future for E&E systems?

While there will be more to learn and challenges to overcome, the first states completing the E&E checklists have an opportunity to lead the way on working with CMS to successfully build and implement E&E systems that benefit all stakeholders.

On July 31, 2017, CMS released the MECT 2.2 as an update to the MECT 2.1.1. As the recent changes continue to be analyzed, what will the impact be to current and future MMIS and E&E projects?

Check back here at BerryDunn Briefings in the coming weeks and we will help you sort it out.

Article
Check this: CMS checklists aren't just for MMIS anymore.