Skip to Main Content

insightsarticles

EHR implementation: The go or
no-go
decision

05.15.23

Read this if you are considering an Electronic Health Record (EHR) system implementation.

The go-no-go decision is a pivotal milestone in an EHR implementation. The meeting is years in the making. You’ve evaluated EHR vendors, signed a contract, waited for the implementation to begin—and then spent the better part of a year battling through the hard work of an implementation. Your team will be tired, stressed, and very focused on reaching that goal of the go-live event. The team has very little desire to have the project go on any longer than needed. The EHR is built and tested. You are likely focused on finalizing the training plans for your providers, nurses, and other end users. You may be in the process of lowering patient schedule volume for the go-live window. 

The desire to go live can cause both the vendor and your team to want to downplay the go-no-go decision and just proceed. Whatever you do, avoid that impulse. 

The go-or-no-go discussion: an EHR implementation best practice

Take the time to have the discussion of whether to go live or not. Doing so is an implementation best practice. It allows your team to step back and ask some fundamental questions. Are we ready to go live? Is there an acceptable level of risk, being aware that there will never be no risk? When you decide to conduct a go-no-go meeting, here are some points to consider:

  • Acceptable level of risk
    As the reality is that no go-live is risk free, you’ll need to assess if there is an acceptable level of risk with your leadership team. This will vary by the specific risks and issues of your project and the specific conditions at your health system. For example, if the testing results for charge capture and claims testing are less than desirable and the financial health of the hospital cannot tolerate a significant impact on cash flow, it may not be an acceptable risk at this time. Or, if your orthopedic group or surgical team are both influential groups of leaders and high revenue generating departments and their order sets, charges, and documentation templates are not yet built, it could be a reason to delay. Acceptable risk is not clear cut and varies from organization to organization. By focusing on the risks and issues, you can determine as a team if the risk is acceptable.
  • Continuation bias
    Continuation bias is the unconscious belief that you should continue with an original plan (such as a go-live date) despite changing conditions. In aviation, this can lead to flight crashes when weather changes. Similarly, it can lead to failed EHR projects if, for example, the testing results were low, the defects were not quite resolved, and the system was not quite ready. To reduce charging forward, discuss the concept of continuation bias in advance with your leadership team. Discuss openly if you believe it may be creeping into your thinking. Use the written risks and issues for the project to guide your decision-making much like a pilot would look at the current weather conditions before deciding to land the plane.
  • Contingency plans
    Mitigation plans reduce the risk from occurring and negatively impacting the project. As you get closer to a go-live event, you will want to document contingency plans for what to do if the risk occurs after go-live. By documenting contingency plans, you can identify which, if any, contingency plans are not realistic. For example, if Accounts Receivable is disrupted and cash flow is slowed, your contingency plan might be to use your line of credit. However, if your line of credit is fully used because of the recent construction project, that contingency plan is unrealistic. If you have unrealistic contingency plans and the likelihood of needing that plan is high, you may not be ready to go live. 
  • Around the room
    It is important you allow all the voices of your leadership and project team to be heard. It is possible that some people believe you are ready to proceed while others do not. Working through the differing opinions until you have general agreement to either proceed or delay will help your team get behind the decision. Silence is not an option during this session and all leaders and perspectives need to be heard and understood. This better prepares you to lead your health system through the subsequent steps and minimize any Monday-morning quarterbacking. 
  • Readiness survey
    Your leadership and project team may not see all the reasons for proceeding to go live—or choosing to delay. The wider group of employees and those involved in the implementation may see important information that should be taken into consideration. An electronic readiness survey prior to your go-no-go meeting is an effective tool for gathering this information. It can be as simple as a readiness Likert scale and some open-ended questions about readiness and top concerns. Survey responses can provide your leadership team with a deeper level of information to inform decisions. 
  • Can you name it
    It’s normal for your team to feel anxious heading into a go-no-go decision. Differentiating between generalized worry and an impactful risk is important. Ask your team to name the risk, describe the risk, and define the impact of the risk. If they are able to complete that exercise with specific details, it may be a risk to consider. If they are unable to share that level of detail, it may be an indicator of just plain old worry, and it may be safe to proceed. 
  • Missed approach criteria
    Even after you make a go decision, there is a small chance you could have a problem occur that would cause you to not go live when planned. The list of factors that would cause you to not go live should be short and defined in advance. For example, if the vendor has a major technical issue making the system unavailable for go-live, if weather prevents any of the vendor team from arriving on-site for the cutover, or if a critical issue that was planned to be resolved before go-live is not. Having these criteria defined and known in advance allows you to use them if something occurs that needs further clarity and agreement with your leadership team.

The go-no-go decision is a crucial step in implementing an EHR system and often can be the difference between success and failure. Planning this step from the start of the project will set you up to have the discipline to complete it when the pressure of the implementation and your timeline is bearing down on you.

Related Professionals

Principals

BerryDunn experts and consultants

Read this if your company is considering outsourced information technology services.

For management, it’s the perennial question: Keep things in-house or outsource?

For management, it’s the perennial question: Keep things in-house or outsource? Most companies or organizations have outsourcing opportunities, from revenue cycle to payment processing to IT security. When deciding whether to outsource, you weigh the trade-offs and benefits by considering variables such as cost, internal expertise, cross coverage, and organizational risk.

In IT services, outsourcing may win out as technology becomes more complex. Maintaining expertise and depth for all the IT components in an environment can be resource-intensive.

Outsourced solutions allow IT teams to shift some of their focus from maintaining infrastructure to getting more value out of existing systems, increasing data analytics, and better linking technology to business objectives. The same can be applied to revenue cycle outsourcing, shifting the focus from getting clean bills out and cash coming in, to looking at the financial health of the organization, analyzing service lines, patient experience, or advancing projects.  

Once you’ve decided, there’s another question you need to ask
Lost sometimes in the discussion of whether to use outsourced services is how. Even after you’ve done your due diligence and chosen a great vendor, you need to stay involved. It can be easy to think, “Vendor XYZ is monitoring our servers or our days in AR, so we should be all set. I can stop worrying at night about our system reliability or our cash flow.” Not true.

You may be outsourcing a component of your technology environment or collections, but you are not outsourcing the accountability for it—from an internal administrative standpoint or (in many cases) from a legal standpoint.

Beware of a false state of confidence
No matter how clear the expectations and rules of engagement with your vendor at the onset of a partnership, circumstances can change—regulatory updates, technology advancements, and old-fashioned vendor neglect. In hiring the vendor, you are accountable for oversight of the partnership. Be actively engaged in the ongoing execution of the services. Also, periodically revisit the contract, make sure the vendor is following all terms, and confirm (with an outside audit, when appropriate) that you are getting the services you need.

Take, for example, server monitoring, which applies to every organization or company, large or small, with data on a server. When a managed service vendor wants to contract with you to provide monitoring services, the vendor’s salesperson will likely assure you that you need not worry about the stability of your server infrastructure, that the monitoring will catch issues before they occur, and that any issues that do arise will be resolved before the end user is impacted. Ideally, this is true, but you need to confirm.

Here’s how to stay involved with your vendor
Ask lots of questions. There’s never a question too small. Here are samples of how precisely you should drill down:

  • What metrics will be monitored, specifically?
  • Why do the metrics being monitored matter to our own business objectives?
  • What thresholds must be met to notify us or produce an alert?
  • What does exceeding a threshold mean to our business?
  • Who on our team will be notified if an alert is warranted?
  • What corrective action will be taken?

Ask uncomfortable questions
Being willing to ask challenging questions of your vendors, even when you are not an expert, is critical. You may feel uncomfortable but asking vendors to explain something to you in terms you understand is very reasonable. They’re the experts; you’re not expected to already understand every detail or you wouldn’t have needed to hire them. It’s their job to explain it to you. Without asking these questions, you may end up with a fairly generic solution that does produce a service or monitor something, but not necessarily all the things you need.

Ask obvious questions
You don’t want anything to slip by simply because you or the vendor took it for granted. It is common to assume that more is being done by a vendor than actually is. By asking even obvious questions, you can avoid this trap. All too often we conduct an IT assessment and are told that a vendor is providing a service, only to discover that the tasks are not happening as expected.

You are accountable for your whole team—in-house and outsourced members
An outsourced solution is an extension of your team. Taking an active and engaged role in an outsourcing partnership remains consistent with your management responsibilities. At the end of the day, management is responsible for achieving business objectives and mission. Regularly check in to make sure that the vendor stays focused on that same mission.

Article
Oxymoron of the month: Outsourced accountability

More and more emphasis is being put on cybersecurity by companies of all sizes. Whether it’s the news headlines of notable IT incidents, greater emphasis on the value of data, or the monetization of certain types of attacks, an increasing amount of energy and money is going towards security. Security has the attention of leadership and the board and it is not going away. One of the biggest risks to and vulnerabilities of any organization’s security continues to be its people. Innovative approaches and new technology can reduce risk but they still don’t prevent the damage that can be inflicted by an employee simply opening an attachment or following a link. This is more likely to happen than you may think.

Technology also doesn’t prepare a management team for how to handle the IT response, communication effort, and workforce management required during and after an event. Technology doesn’t lessen the operational impact that your organization will feel when, not if, you experience an event.

So let’s examine the human and operational side of cybersecurity. Below are three factors you should address to reduce risk and prepare your organization for an event:

  1. People: Create and maintain a vigilant workforce
    Ask yourself, “How prepared is our workforce when it comes to security threats and protecting our data? How likely would it be for one of our team members to click on a link or open an attachment that appear to be from our CFO? Would our team members look closely enough at the email address and notice that the organization name is different by one letter?”
     

    According to the 2016 Verizon Data Breach Report, 30% of phishing messages were opened by the target across all campaigns and 12% went on to click on the attachment or link.

    Phishing email attacks directed at your company through your team range from very obvious to extremely believable. Some attempts are sent widely and are looking for just one person to click, while others are extremely targeted and deliberate. In either case, it is vital that each employee takes enough time to realize that the email request is unusual. Perhaps there are strange typos in the request or it is odd the CFO is emailing while on vacation. That moment your employees take to pause and decide whether to click on the link/attachment could mean the difference between experiencing an event or not.

    So how do you create and cultivate this type of thought process in your workforce? Lots of education and awareness efforts. This goes beyond just an annual in-service training on HIPAA. It may include education sessions, emails with tips and tricks, posters describing the risk, and also exercises to test your workforce against phishing and security exploits. It also takes leadership embracing security as a strategic imperative and leading the organization to take it seriously. Once you have these efforts in place, you can create culture change to build and maintain an environment where an employee is not embarrassed to check with the CFO’s office to see if they really did send an email from Bora Bora.
  1. Plan: Implement a disaster recovery and incident response plan 
    Through the years, disaster recovery plans have been the usual response. Mostly, the emphasis has been on recovering data after a non-security IT event, often discussed in context of a fire, power loss, or hardware failure. Increasingly, cyber-attacks are creeping into the forefront of planning efforts. The challenge with cyber-events is that they are murkier to understand – and harder for leadership – to assist with.

    It’s easier to understand the concept of a fire destroying your server room and the plan entailing acquiring new equipment, recovering data from backup, restoring operations, having good downtime procedures, and communicating the restoration efforts along the way. What is much more challenging is if the event begins with a suspicion by employees, customers, or vendors who believe their data has been stolen without any conclusive information that your company is the originating point of the data loss. How do you take action if you know very little about the situation? What do you communicate if you are not sure what to say? It is this level of uncertainty that makes it so difficult. Do you have a plan in place for how to respond to an incident? Here are some questions to consider:
     
    1. How will we communicate internally with our staff about the incident?
    2. How will we communicate with our clients? Our patients? Our community?
    3. When should we call our insurance company? Our attorney?
    4. Is reception prepared to describe what is going on if someone visits our office?
    5. Do we have the technical expertise to diagnose the issue?
    6. Do we have set protocols in place for when to bring our systems off-line and are our downtime procedures ready to use?
    7. When the press gets wind of the situation, who will communicate with them and what will we share?
    8. If our telephone system and network is taken offline, how we will we communicate with our leadership team and workforce?

By starting to ask these questions, you can ascertain how ready you may, or may not be, for a cyber-attack when it comes.

  1. Practice: Prepare your team with table top exercises  
    Given the complexity and diversity of the threats people are encountering today, no single written plan can account for all of the possible combinations of cyber-attacks. A plan can give guidance, set communication protocols, and structure your approach to your response. But by conducting exercises against hypothetical situations, you can test your plan, identify weaknesses in the plan, and also provide your leadership team with insight and experience – before it counts.

    A table top exercise entails one team member (perhaps from IT or from an outside firm) coming up with a hypothetical situation and a series of facts and clues about the situation that are given to your leadership team over time. Your team then implements the existing plans to respond to the incident and make decisions. There are no right or wrong answers in this scenario. Rather, the goal is to practice the decision-making and response process to determine where improvements are needed.

    Maybe you run an exercise and realize that you have not communicated to your staff that no mention of the event should be shared by employees on social media. Maybe the exercise makes you realize that the network administrator who is on vacation at the time is the only one who knows how to log onto the firewall. You might identify specific gaps that are lacking in your cybersecurity coverage. There is much to learn that can help you prepare for the real thing.

As you know, there are many different threats and risks facing organizations. Some are from inside an organization while others come from outside. Simply throwing additional technology at the problem will not sufficiently address the risks. While your people continue to be one of the biggest threats, they can also be one of your biggest assets, in both preventing issues from occurring and then responding quickly and appropriately when they do. Remember focus on your People, Your Plan, and Your Practice.

Article
The three P's of improving your company's cybersecurity soft skills

We’ve all heard stories about organizations spending thousands on software projects, such as Enterprise Resource Planning (ERP), Electronic Health Record (EHR), or Student Information Systems (SIS) that take longer than expected to implement and exceed original budgets. One of the reasons this occurs is that organizations often don’t realize that purchasing a large, Commercial Off-The-Shelf (COTS) enterprise system is a significant undertaking. If the needs aren’t sufficiently defined, there can be many roadblocks, including implementation delays, increased cost, scope creep, and ultimately, unsatisfactory results (delayed or unfinished projects and cost overruns).

These systems are complex, and implementation efforts impact both internal and external stakeholders. Procurement often requires participation from different departments, each with unique goals and perspectives. Ignore these perspectives at your own peril. Here are key questions to consider for making the best buying decision:

  1. Should we purchase software that similar organizations have purchased?
    As vendor consolidation has diminished the number of distinct COTS systems available, this question is increasingly common. Following this approach is similar to deciding to buy the car that your neighbor did, because they seem satisfied. How can you be sure that the systems purchased by similar organizations will meet your needs, particularly if your needs are undefined? One way to identify your organization’s needs—and to avoid costly mistakes down the road—is to identify requirements during the procurement process.

  2. What are the functional and technical requirements of the system?Requirements are details that help describe a software system. There are two types of requirements and you need to understand and review both:

    Functional requirements. These define specific functions of a system to meet day-to-day needs of an organization or department. They describe the necessary system capabilities that allow users to perform their jobs. For example, “The vendor file must provide a minimum of four (4) remit-to addresses.” Functional requirements may also define the mandated state or federal capabilities required of a system, such as the ability to produce W-2 or 1099 forms.

    Technical requirements. These requirements identify criteria used to judge the operation of a system, rather than specific behaviors. They can be requirements that define what database the system must support. For example, “The system must support use of the client preferred database.” They may also describe security capabilities of the system, the ability to import or export data, or the ease of use and overall end-user interface.

  3. Who should help define and document requirements for the new enterprise system?

    When it comes to documenting and revising requirements, work with your IT staff; incorporating technology standards into a set of requirements is a best practice. Yet it is also necessary to seek input from non-IT individuals, or business process owners from multiple departments, those who will use and/or be affected by the new software system.

    Help these individuals or groups understand the capabilities of modern software systems by having them visit the sites of other organizations, or attend software industry conferences. You should also have them document the current system’s deficiencies. As for those in your organization who want to keep the current system, encourage their buy-in by asking them to highlight the system’s most valuable capabilities. Perspectives from both new system supporters and those not so eager to change will help build the best system.
     
  4. When do you revise enterprise system requirements?
    It is always important to begin the software procurement process with a documented set of requirements; you need them to identify the best solution. The same goes for the implementation process where vendors use the requirements to guide the setup and configuration of the new system. But be prepared to revise and enhance requirements when a vendor solution offers an improved capability or a better method to achieve the results. The best way to approach it is to plan to revise requirements constantly. This enables the software to better meet current needs, and often delivers enhanced capabilities.

Be sure to document system requirements for an efficient process

There may be thousands of requirements for an enterprise system. To make the procurement process as efficient as possible, continually define and refine requirements. While this takes time and resources, there are clear benefits:

  • Having requirements defined in an RFP helps vendors match the capabilities of their software systems to your organization’s needs and functional expectations. Without requirements, the software procurement and selection process has little framework, and from a vendor perspective becomes a subjective process — making it hard to get consistent information from all vendors.
  • Requirements help determine specific tasks and activities to address during the implementation process. While applications can’t always meet 100% of the requested functionalities, it’s important to emphasize the requirements that are most important to users, to help find the system that best meets the needs of your organization.
  • Requirements prove valuable even after implementation has begun, as they can help you test your system to make sure the software meets your organization’s particular needs before production use of the new system.

Our experienced consultants have led many software procurement projects and have firsthand knowledge about the challenges and opportunities associated with purchasing and implementing systems large and small. BerryDunn maintains an active database of requirements that we continually enhance, based on work performed for various clients and on technological advancements in the marketplace. Please contact us and we can help you define your requirements for large software system purchases.

Article
Four questions to ask before purchasing an enterprise software system

Read this if your organization is planning on upgrading or replacing an enterprise technology system.

It can be challenging and stressful to plan for technology initiatives, especially those that involve and impact every area of your organization. Common initiatives include software upgrades or replacements for:

  • Financial management, such as Enterprise Resource Planning (ERP) systems
  • Asset management systems
  • Electronic health records (EHR) systems
  • Permitting and inspections systems

Though the number of considerations when planning enterprise technology projects can be daunting, the greatest mistake you can make is not planning at all. By addressing just a few key areas, you can avoid some of the most common pitfalls, such as exceeding budget and schedule targets, experiencing scope creep, and losing buy-in among stakeholders. Here are some tips to help you navigate your next project:

Identify your IT project roles and resources

While most organizations understand the importance of identifying project stakeholder groups, it is often an afterthought. Defining these roles at the outset of your project helps you accurately estimate the work effort.

Your stakeholder groups may include:

  • An executive sponsor
  • A steering committee
  • A project manager
  • Functional leads
  • A technical team

Once you’ve established the necessary roles, you can begin reviewing your organization’s resources to determine the people who will be available to fill them. Planning for resource availability will help you avoid delays, minimize impact to regular business processes, and reduce the likelihood of burnout. But this plan won’t remain static—you can expect to make updates throughout the project.

Establish clear goals and objectives to keep your technology project on track

It’s important that an enterprise technology project has established goals and objectives statements. These statements will help inform decision-making, provide benchmarks for progress, and measure your project’s success. They can then be referenced when key stakeholders have differing perspectives on the direction to take with a pending decision. For example, if the objective of your project is to reduce paper-based processes, you may plan for additional computer workstations and focus technical resources on provisioning them. You’ll also be able to measure your success in the reduction of paper-based tasks.

Estimate your IT project budget accurately

Project funding is hardly ever overlooked, but can be complex with project budgets that are either underestimated or estimated without sufficient rationale to withstand approval processes and subsequent budget analysis. You may find that breaking down estimates to a lower level of detail helps address these challenges. Most technology projects incur costs in three key areas:

  • Vendor cost: This could include both one-time software implementation costs as well as recurring costs for maintenance and ongoing support.
  • Infrastructure cost: Consider the cost of any investments needed to support your project, such as data center hardware, networking components, or computing devices.
  • Supplemental resource cost: Don’t forget to include the cost of any additional resources needed for their specialized knowledge or to simply backfill project staff. This could include contracted resources or the additional cost of existing resources (i.e., overtime).

A good technology project budget also includes a contingency amount. This amount will depend on your organization’s standards, the relative level of confidence in your estimates, and the relative risk.

Anticipate the need for change management

Depending on the project, staff in many areas of your organization will be impacted by some level of change during a technology implementation. External stakeholders, such as vendors and the public, may also be affected. You can effectively manage this change by proactively identifying areas of likely change resistance and creating strategies to address them.

In any technology implementation, you will encounter change resistance you did not predict. Having strategies in place will help you react quickly and effectively. Some proven change management strategies include communicating throughout your project, involving stakeholders to get their buy-in, and helping ensure management has the right amount of information to share with their employees.

Maintain focus and stay flexible as you manage your IT project

Even with the most thought-out planning, unforeseen events and external factors may impact your technology project. Establish mechanisms to regularly and proactively monitor project status so that you can address material risks and issues before their impact to the project grows. Reacting to these items as they arise requires key project stakeholders to be flexible. Key stakeholders must recognize that new information does not necessarily mean previous decisions were made in error, and that it is better to adapt than to stick to the initial direction.

Whether you’re implementing an ERP, an EHR, or enterprise human resources or asset management systems, any enterprise technology project is a massive undertaking, involving significant investment and a coordinated effort with individuals across multiple areas of an organization. Common mistakes can be costly, but having a structured approach to your planning can help avoid pitfalls. Our experienced, objective advisors have worked with public and private organizations across the country to oversee large enterprise projects from inception to successful completion.

Contact our software consulting team with any questions.

Article
Planning for a successful enterprise technology project

Do you know what would happen to your company if your CEO suddenly had to resign immediately for personal reasons? Or got seriously ill? Or worse, died? These scenarios, while rare, do happen, and many companies are not prepared. In fact, 45% of US companies do not have a contingency plan for CEO succession, according to a 2020 Harvard Business Review study.  

Do you have a plan for CEO succession? As a business owner, you may have an exit strategy in place for your company, but do you have a plan to bridge the leadership gap for you and each member of your leadership team? Does the plan include the kind of crises listed above? What would you do if your next-in-line left suddenly? 

Whether yours is a family-owned business, a company of equity partners, or a private company with a governing body, here are things to consider when you’re faced with a situation where your CEO has abruptly departed or has decided to step down.  

1. Get a plan in place. First, assess the situation and figure out your priorities. If there is already a plan for these types of circumstances, evaluate how much of it is applicable to this particular circumstance. For example, if the plan is for the stepping down or announced retirement of your CEO, but some other catastrophic event occurs, you may need to adjust key components and focus on immediate messaging rather than future positioning. If there is no plan, assign a small team to create one immediately. 

Make sure management, team leaders, and employees are aware and informed of your progress; this will help keep you organized and streamline communications. Management needs to take the lead and select a point person to document the process. Management also needs to take the lead in demeanor. Model your actions so employees can see the situation is being handled with care. Once a strategy is identified based on your priorities, draft a plan that includes what happens now, in the immediate future, and beyond. Include timetables so people know when decisions will be made.  

2. Communicate clearly, and often. In times of uncertainty, your employees will need as much specific information as you can give them. Knowing when they will hear from you, even if it is “we have nothing new to report” builds trust and keeps them vested and involved. By letting them know what your plan is, when they’ll receive another update, what to tell clients, and even what specifics you can give them (e.g., who will take over which CEO responsibility and for how long), you make them feel that they are important stakeholders, and not just bystanders. Stakeholders are more likely to be strong supporters during and after any transition that needs to take place. 

3. Pull in professional help. Depending on your resources, we recommend bringing in a professional to help you handle the situation at hand. At the very least, call in an objective opinion. You’ll need someone who can help you make decisions when emotions are running high. Bringing someone on board that can help you decipher what you have to work with and what your legal and other obligations may be, help rally your team, deal with the media, and manage emotions can be invaluable during a challenging time. Even if it’s temporary. 

4. Develop a timeline. Figure out how much time you have for the transition. For example, if your CEO is ill and will be stepping down in six months, you have time to update any existing exit strategy or succession plan you have in place. Things to include in the timeline: 

  • Who is taking over what responsibilities? 
  • How and what will be communicated to your company and stakeholders? 
  • How and what will be communicated to the market? 
  • How will you bring in the CEO's replacement, while helping the current CEO transition out of the organization? 

If you are in a crisis situation (e.g., your CEO has been suddenly forced out or asked to leave without a public explanation), you won’t have the luxury of time.  

Find out what other arrangements have been made in the past and update them as needed. Work with your PR firm to help with your change management and do the right things for all involved to salvage the company’s reputation. When handled correctly, crises don’t have to have a lasting negative impact on your business.   

5. Manage change effectively. When you’re under the gun to quickly make significant changes at the top, you need to understand how the changes may affect various parts of your company. While instinct may tell you to focus externally, don’t neglect your employees. Be as transparent as you possibly can be, present an action plan, ask for support, and get them involved in keeping the environment positive. Whether you bring in professionals or not, make sure you allow for questions, feedback, and even discord if challenging information is being revealed.  

6. Handle the media. Crisis rule #1 is making it clear who can, and who cannot, speak to the media. Assign a point person for all external inquiries and instruct employees to refer all reporter requests for comment to that point person. You absolutely do not want employees leaking sensitive information to the media. 
 
With your employees on board with the change management action plan, you can now focus on external communications and how you will present what is happening to the media. This is not completely under your control. Technology and social media changed the game in terms of speed and access to information to the public and transparency when it comes to corporate leadership. Present a message to the media quickly that coincides with your values as a company. If you are dealing with a scandal where public trust is involved and your CEO is stepping down, handling this effectively will take tact and most likely a team of professionals to help. 

Exit strategies are planning tools. Uncontrollable events occur and we don’t always get to follow our plan as we would have liked. Your organization can still be prepared and know what to do in an emergency situation or sudden crisis.  Executives move out of their roles every day, but how companies respond to these changes is reflective of the strategy in place to handle unexpected situations. Be as prepared as possible. Own your challenges. Stay accountable. 

BerryDunn can help whether you need extra assistance in your office during peak times or interim leadership support during periods of transition. We offer the expertise of a fully staffed accounting department for short-term assignments or long-term engagements―so you can focus on your business. Meet our interim assistance experts.

Article
Crisis averted: Why you need a CEO succession plan today

Read this if your CFO has recently departed, or if you're looking for a replacement.

With the post-Covid labor shortage, “the Great Resignation,” an aging workforce, and ongoing staffing concerns, almost every industry is facing challenges in hiring talented staff. To address these challenges, many organizations are hiring temporary or interim help—even for C-suite positions such as Chief Financial Officers (CFOs).

You may be thinking, “The CFO is a key business partner in advising and collaborating with the CEO and developing a long-term strategy for the organization; why would I hire a contractor to fill this most-important role?” Hiring an interim CFO may be a good option to consider in certain circumstances. Here are three situations where temporary help might be the best solution for your organization.

Your organization has grown

If your company has grown since you created your finance department, or your controller isn’t ready or suited for a promotion, bringing on an interim CFO can be a natural next step in your company’s evolution, without having to make a long-term commitment. It can allow you to take the time and fully understand what you need from the role — and what kind of person is the best fit for your company’s future.

BerryDunn's Kathy Parker, leader of the Boston-based Outsourced Accounting group, has worked with many companies to help them through periods of transition. "As companies grow, many need team members at various skill levels, which requires more money to pay for multiple full-time roles," she shared. "Obtaining interim CFO services allows a company to access different skill levels while paying a fraction of the cost. As the company grows, they can always scale its resources; the beauty of this model is the flexibility."

If your company is looking for greater financial skill or advice to expand into a new market, or turn around an underperforming division, you may want to bring on an outsourced CFO with a specific set of objectives and timeline in mind. You can bring someone on board to develop growth strategies, make course corrections, bring in new financing, and update operational processes, without necessarily needing to keep those skills in the organization once they finish their assignment. Your company benefits from this very specific skill set without the expense of having a talented but expensive resource on your permanent payroll.

Your CFO has resigned

The best-laid succession plans often go astray. If that’s the case when your CFO departs, your organization may need to outsource the CFO function to fill the gap. When your company loses the leader of company-wide financial functions, you may need to find someone who can come in with those skills and get right to work. While they may need guidance and support on specifics to your company, they should be able to adapt quickly and keep financial operations running smoothly. Articulating short-term goals and setting deadlines for naming a new CFO can help lay the foundation for a successful engagement.

You don’t have the budget for a full-time CFO

If your company is the right size to have a part-time CFO, outsourcing CFO functions can be less expensive than bringing on a full-time in-house CFO. Depending on your operational and financial rhythms, you may need the CFO role full-time in parts of the year, and not in others. Initially, an interim CFO can bring a new perspective from a professional who is coming in with fresh eyes and experience outside of your company.

After the immediate need or initial crisis passes, you can review your options. Once the temporary CFO’s agreement expires, you can bring someone new in depending on your needs, or keep the contract CFO in place by extending their assignment.

Considerations for hiring an interim CFO

Making the decision between hiring someone full-time or bringing in temporary contract help can be difficult. Although it oversimplifies the decision a bit, a good rule of thumb is: the more strategic the role will be, the more important it is that you have a long-term person in the job. CFOs can have a wide range of duties, including, but not limited to:

  • Financial risk management, including planning and record-keeping
  • Management of compliance and regulatory requirements
  • Creating and monitoring reliable control systems
  • Debt and equity financing
  • Financial reporting to the Board of Directors

If the focus is primarily overseeing the financial functions of the organization and/or developing a skilled finance department, you can rely — at least initially — on a CFO for hire.

Regardless of what you choose to do, your decision will have an impact on the financial health of your organization — from avoiding finance department dissatisfaction or turnover to capitalizing on new market opportunities. Getting outside advice or a more objective view may be an important part of making the right choice for your company.

BerryDunn can help whether you need extra assistance in your office during peak times or interim leadership support during periods of transition. We offer the expertise of a fully staffed accounting department for short-term assignments or long-term engagements―so you can focus on your business. Meet our interim assistance experts.

Article
Three reasons to consider hiring an interim CFO

Follow these six steps to help your senior living organization improve cash flow, decrease days in accounts receivable, and reduce write offs.

From regulatory and reimbursement rule changes to new software and staff turnover, senior living facilities deal with a variety of issues that can result in eroding margins. Monitoring days in accounts receivable and creeping increases in bad debt should be part of a regular review of your facility’s financial indicators.

Here are six steps you and your organization can take to make your review more efficient and potentially improve your bottom line:

Step 1: Understand your facility’s current payer mix.

Understanding your payer mix and various billing requirements and reimbursement schedules will help you set reasonable goals and make an accurate cash flow forecast. For example, government payers often have a two-week reimbursement turn-around for a clean claim, while commercial insurance reimbursement may take up to 90 days. Discovering what actions you can take to keep the payment process as short as possible can lessen your average days in accounts receivable and improve cash flow.

Step 2: Gain clarity on your facility’s billing calendar.

Using data from Step 1, review (or develop) your team’s billing calendar. The faster you send a complete and accurate bill, the sooner you will receive payment.

Have a candid discussion with your billers and work on removing (or at least reducing) existing or perceived barriers to producing timely and accurate bills. Facilities frequently find opportunities for cash flow optimization by communicating their expectations for vendors and care partners. For example, some facilities rely on their vendors to provide billing logs for therapy and ancillary services in order to finalize Resource Utilization Groups (RUGs) and bill Medicare and advantage plans. Delayed medical supply and pharmacy invoices frequently hold up private pay billing. Working with vendors to shorten turnaround time is critical to receiving faster payments.

Interdependencies and areas outside the billers’ control can also negatively influence revenue cycle and contribute to payment delays. Nursing and therapy department schedules, documentation, and the clinical team’s understanding of the principles of reimbursement all play significant roles in timeliness and accuracy of Minimum Data Sets (MDSs) — a key component of Medicare and Medicaid billing. Review these interdependencies for internal holdups and shorten time to get claims produced.

Step 3: Review billing practices.

Observe your staff and monitor the billing logs and insurance claim acceptance reports to locate and review rejected invoices. Since rejected claims are not accepted into the insurer’s system, they will never be reflected as denied on remittance advice documents. Review of submitted claims for rejections is also important as frequently billing software marks claims as billed after a claim is generated. Instruct billers to review rejections immediately after submitting the bill, so rework, resubmission, and payment are timely.

Encourage your billers to generate pull communications (using available reporting tools on insurance portals) to review claim status and resolve any unpaid or suspended claims. This is usually a quicker process than waiting for a push communication (remittance advice) to identify unpaid claims.

Step 4: Review how your facility receives payments.

Challenge any delays in depositing money. Many insurance companies offer payment via ACH transfer. Discuss remote check deposit solutions with your financial institution to eliminate delays. If the facility acts as a representative payee for residents, make sure social security checks are directly deposited to the appropriate account. If you use a separate non-operating account to receive residents’ pensions, consider same day bill pay transfer to the operating account.

Step 5: Review industry benchmarks.

This is critical to understanding where your facility stands and seeing where you can make improvements. BerryDunn’s database of SNF Medicare cost reports filed for FY 2015 - 2018 shows:

Skilled Nursing Facilities: Days in Accounts Receivable

Step 6: Celebrate successes!

Clearly some facilities are doing it very well, while some need to take corrective action. This information can also help you set reasonable goals overall (see Step 1) as well as payer-specific reimbursement goals that make sense for your facility. Review them with the revenue cycle team and question any significant variances; challenge staff to both identify reasons for variances and propose remedial action. Helping your staff see the big picture and understanding how they play a role in achieving department and company goals are critical to sustaining lasting change AND constant improvement.

Change, even if it brings intrinsic rewards (like decreased days in accounts receivable, increased margin to facilitate growth), can be difficult. Acknowledge that changing processes can be tough and people may have to do things differently or learn new skills to meet the facility’s goal. By celebrating the improvements — even little ones — like putting new processes in place, you encourage and engage people to take ownership of the process. Celebrating the wins helps create advocates and lets your team know you appreciate their work. 

To learn more, contact one of our revenue cycle specialists.

Article
Six steps to gain speed on collections