Don't worry, just assess: Eight tips for reducing
go-live
stress

06.07.17 /

We all know them. In fact, you might be one of them — people who worry the words “go live” will lead to job loss (theirs). This feeling is not entirely irrational. When an organization is ready to go live from an existing legacy system to a new enterprise system, stress levels rise and doubts emerge: What can go wrong? How much time will be lost? Are we really ready for this?

We’re here to help. Here is a list of go-live essentials to help you mitigate stress and assess your readiness. While not all-encompassing, it’s a good place to start. Here’s what you need:

  1. A detailed project plan which specifies all of the implementation tasks
    A project plan is one of the most important parts of an implementation. A detailed plan that identifies all of the implementation tasks along with an assigned resource for each task is critical to success. The implementation vendor and the organization should develop this plan together to get buy-in from both teams.
  1. A completed system configuration
    New system configuration is one of the most time-consuming aspects of a technology implementation. If you don’t complete the implementation in a timely manner, it will impact your go-live date. Configure the new system based upon the best practices of the system — not how the existing system was — for timely implementation.
  1. External system interface identification
    While replacement of some external systems may be a goal of an implementation, there may be situations where external systems are not replaced or the organization has to send and/or receive data from external organizations. And while new systems have advanced interface technology capabilities, the external systems may not share these capabilities. Therefore it is imperative that you identify external system interfaces to avoid gaps in functionality.
  1. Testing, testing, testing
    End-to-end testing or User Acceptance Testing (UAT) is often overlooked. It involves completing testing scenarios for each module to ensure appropriate system configuration. While the timing of UAT may vary, allow adequate time to identify solutions to issues that may result from UAT.
  1. Data conversion validation
    When you begin using a new system, it’s best to ensure you’re working with clean, up-to-date data. Identify data conversion tasks in the project plan and include multiple data conversion passes. You must also determine if the existing data is actually worth converting. When you complete the data conversion, check for accuracy.
  1. End user training
    You must train all end users to ensure proper utilization across the organization. Don’t underestimate the amount of time needed for end user training. It is also important to provide a feedback mechanism for end users to determine if the training was successful.
  1. A go-live cutover plan
    The overall project plan may indicate go-live as an activity. List specific activities to complete as part of go-live. You can build these tasks into the project plan or maintain them as a separate checklist to promote a smooth transition.
  1. Support structure
    Establish an internal support structure when preparing for go-live to help address issues that may arise. Most organizations take time to configure and test the system and provide training to end users prior to go-live. Questions will arise as part of this process — establish a process to track and address these questions.

Technology implementations can significantly impact your organization, and it’s common for stress levels to rise during the go-live process. But with the right assessment and preparation, you can lessen their impact and reduce staff stress. Our experienced, objective advisors work with public and private sector organizations across the country to oversee large enterprise projects from inception to successful completion. Please reach out to us to learn more about preparing for your next big project.

Related Industries

We’ve all heard stories about organizations spending thousands on software projects, such as Enterprise Resource Planning (ERP), Electronic Health Record (EHR), or Student Information Systems (SIS) that take longer than expected to implement and exceed original budgets. One of the reasons this occurs is that organizations often don’t realize that purchasing a large, Commercial Off-The-Shelf (COTS) enterprise system is a significant undertaking. If the needs aren’t sufficiently defined, there can be many roadblocks, including implementation delays, increased cost, scope creep, and ultimately, unsatisfactory results (delayed or unfinished projects and cost overruns).

These systems are complex, and implementation efforts impact both internal and external stakeholders. Procurement often requires participation from different departments, each with unique goals and perspectives. Ignore these perspectives at your own peril. Here are key questions to consider for making the best buying decision:

  1. Should we purchase software that similar organizations have purchased?
    As vendor consolidation has diminished the number of distinct COTS systems available, this question is increasingly common. Following this approach is similar to deciding to buy the car that your neighbor did, because they seem satisfied. How can you be sure that the systems purchased by similar organizations will meet your needs, particularly if your needs are undefined? One way to identify your organization’s needs—and to avoid costly mistakes down the road—is to identify requirements during the procurement process.

  2. What are the functional and technical requirements of the system?Requirements are details that help describe a software system. There are two types of requirements and you need to understand and review both:

    Functional requirements. These define specific functions of a system to meet day-to-day needs of an organization or department. They describe the necessary system capabilities that allow users to perform their jobs. For example, “The vendor file must provide a minimum of four (4) remit-to addresses.” Functional requirements may also define the mandated state or federal capabilities required of a system, such as the ability to produce W-2 or 1099 forms.

    Technical requirements. These requirements identify criteria used to judge the operation of a system, rather than specific behaviors. They can be requirements that define what database the system must support. For example, “The system must support use of the client preferred database.” They may also describe security capabilities of the system, the ability to import or export data, or the ease of use and overall end-user interface.

  3. Who should help define and document requirements for the new enterprise system?

    When it comes to documenting and revising requirements, work with your IT staff; incorporating technology standards into a set of requirements is a best practice. Yet it is also necessary to seek input from non-IT individuals, or business process owners from multiple departments, those who will use and/or be affected by the new software system.

    Help these individuals or groups understand the capabilities of modern software systems by having them visit the sites of other organizations, or attend software industry conferences. You should also have them document the current system’s deficiencies. As for those in your organization who want to keep the current system, encourage their buy-in by asking them to highlight the system’s most valuable capabilities. Perspectives from both new system supporters and those not so eager to change will help build the best system.
     
  4. When do you revise enterprise system requirements?
    It is always important to begin the software procurement process with a documented set of requirements; you need them to identify the best solution. The same goes for the implementation process where vendors use the requirements to guide the setup and configuration of the new system. But be prepared to revise and enhance requirements when a vendor solution offers an improved capability or a better method to achieve the results. The best way to approach it is to plan to revise requirements constantly. This enables the software to better meet current needs, and often delivers enhanced capabilities.

Be sure to document system requirements for an efficient process

There may be thousands of requirements for an enterprise system. To make the procurement process as efficient as possible, continually define and refine requirements. While this takes time and resources, there are clear benefits:

  • Having requirements defined in an RFP helps vendors match the capabilities of their software systems to your organization’s needs and functional expectations. Without requirements, the software procurement and selection process has little framework, and from a vendor perspective becomes a subjective process — making it hard to get consistent information from all vendors.
  • Requirements help determine specific tasks and activities to address during the implementation process. While applications can’t always meet 100% of the requested functionalities, it’s important to emphasize the requirements that are most important to users, to help find the system that best meets the needs of your organization.
  • Requirements prove valuable even after implementation has begun, as they can help you test your system to make sure the software meets your organization’s particular needs before production use of the new system.

Our experienced consultants have led many software procurement projects and have firsthand knowledge about the challenges and opportunities associated with purchasing and implementing systems large and small. BerryDunn maintains an active database of requirements that we continually enhance, based on work performed for various clients and on technological advancements in the marketplace. Please contact us and we can help you define your requirements for large software system purchases.

Article
Four questions to ask before purchasing an enterprise software system

There’s a good chance that your organization is in the position of needing to do more with less under the strain of staffing constraints and competing initiatives. With fewer resources to work with, you’ll need to be persuasive to get the green light on new enterprise technology initiatives. To do that, you need to present decision makers with well-thought-out and targeted business cases that show your initiative will have impact and will be successful. Yet developing such a business case is no walk in the park. Perhaps because our firm has its roots in New England, we sometimes compare this process to leading a hiking trip into the woods—into the wild. 

Just as in hiking, success in developing a business case for a new initiative boils down to planning, preparation, and applying a few key concepts we’ve learned from our travels. 

Consensus is critical when planning new technology initiatives

Before you can start the hike, everyone has to agree on some fundamentals: 

Who's going? 

Where are we going? 

When do we go and for how long? 

Getting everyone to agree requires clear communication and, yes, even a little salesmanship: “Trust me. The bears aren’t bad this time of year.” The same principle applies in proposing new technology initiatives; making sure everyone has bought into the basic framework of the initiative is critical to success.

Although many hiking trips involve groups of people similar in age, ability, and whereabouts, for your business initiative you need to communicate with diverse groups of colleagues at every level of the organization. Gaining consensus among people who bring a wide variety of skills and perspectives to the project can be complex.

To gain consensus, consider the intended audiences of your message and target the content to what will work for them. It should provide enough information for executive-level stakeholders to quickly understand the initiative and the path forward. It should give people responsible for implementation or who will provide specific skills substantive information to implement the plan. And remember: one of the most common reasons projects struggle to meet their stated objectives (and why some projects never materialize to begin with), is a lack of sponsorship and buy-in. The goal of a business case is to gain buy-in before project initiation, so your sponsors will actively support the project during implementation. 

Set clear goals for your enterprise technology project 

It’s refreshing to take the first steps, to feel that initial sense of freedom as you set off down the trail. Yet few people truly enjoy wandering around aimlessly in the wilderness for an extended period of time. Hikers need goals, like reaching a mountain peak or seeing famous landmarks, or hiking a predetermined number of miles per day. And having a trail guide is key in meeting those goals. 

For a new initiative, clearly define goals and objectives, as well as pain points your organization wishes to address. This is critical to ensuring that the project’s sponsors and implementation team are all on the same page. Identifying specific benefits of completing your initiative can help people keep their “eyes on the prize” when the project feels like an uphill climb.

Timelines provide additional detail and direction—and demonstrate to decision makers that you have considered multiple facets of the project, including any constraints, resource limitations, or scheduling conflicts. Identifying best practices to incorporate throughout the initiative enhances the value of a business case proposition, and positions the organization for success. By leveraging lessons learned on previous projects, and planning for and mitigating risk, the organization will begin to clear the path for a successful endeavor. 

Don’t compromise on the right equipment

Hiking can be an expensive, time-consuming hobby. While the quality of your equipment and the accuracy of your maps are crucial, you can do things with limited resources if you’re careful. Taking the time to research and purchase the right equipment, (like the right hiking boots), keeps your fun expedition from becoming a tortuous slog. 

Similarly, in developing a business case for a new initiative, you need to make sure that you identify the right resources in the right areas. We all live with resource constraints of one sort or another. The process of identifying resources, particularly for funding and staffing the project, will lead to fewer surprises down the path. As many government employees know all too well, it is better to be thorough in the budget planning process than to return to authorizing sources for additional funding while midstream in a project. 

Consider your possible outcomes

You cannot be too singularly focused in the wild; weather conditions change quickly, unexpected opportunities reveal themselves, and being able to adapt quickly is absolutely necessary in order for everyone to come home safely. Sometimes, you should take the trail less traveled, rest in the random lean-to that you and your group stumble upon, or go for a refreshing dip in a lake. By focusing on more than just one single objective, it often leads to more enjoyable, safe, and successful excursions.

This type of outlook is necessary to build a business case for a new initiative. You may need to step back during your initial planning and consider the full impact of the process, including on those outside your organization. For example, you may begin to identify ways in which the initiative could benefit both internal and external stakeholders, and plan to move forward in a slightly new direction. Let’s say you’re building a business case for a new land management and permitting software system. Take time to consider that this system may benefit citizens, contractors, and other organizations that interact with your department. This new perspective can help you strengthen your business case. 

Expect teamwork

A group that doesn’t practice teamwork won’t last long in the wild. In order to facilitate and promote teamwork, it’s important to recognize the skills and contributions of each and every person. Some have a better sense of direction, while some can more easily start campfires. And if you find yourself fortunate enough to be joined by a truly experienced hiker, make sure that you listen to what they have to say.

Doing the hard work to present a business case for a new initiative may feel like a solitary action at times, but it’s not. Most likely, there are other people in your organization who see the value in the initiative. Recognize and utilize their skills in your planning. We also suggest working with an experienced advisor who can leverage best practices and lessons learned from similar projects. Their experience will help you anticipate potential resistance and develop and articulate the mitigation strategies necessary to gain support for your initiative.

If you have thoughts, concerns, or questions, contact our team. We love to discuss the potential and pitfalls of new initiatives, and can help prepare you to head out into the wild. We’d love to hear any parallels with hiking and wilderness adventuring that you have as well. Let us know! 

BerryDunn’s local government consulting team has the experience to lead technology planning initiatives and develop actionable plans that help you think strategically and improve service delivery. We partner with you, maintaining flexibility and open lines of communication to help ensure that your team has the resources it needs.

Our team has broad and deep experience partnering with local government clients across the country to modernize technology-based business transformation projects and the decision-making and planning efforts. Our expertise includes software system assessments/planning/procurement and implementation project management; operational, management, and staffing assessments; information security; cost allocation studies; and data management.  

Article
Into the wild: Building a business case for a new enterprise technology project

Read this if your organization is planning on upgrading or replacing an enterprise technology system.

It can be challenging and stressful to plan for technology initiatives, especially those that involve and impact every area of your organization. Common initiatives include software upgrades or replacements for:

  • Financial management, such as Enterprise Resource Planning (ERP) systems
  • Asset management systems
  • Electronic health records (EHR) systems
  • Permitting and inspections systems

Though the number of considerations when planning enterprise technology projects can be daunting, the greatest mistake you can make is not planning at all. By addressing just a few key areas, you can avoid some of the most common pitfalls, such as exceeding budget and schedule targets, experiencing scope creep, and losing buy-in among stakeholders. Here are some tips to help you navigate your next project:

Identify your IT project roles and resources

While most organizations understand the importance of identifying project stakeholder groups, it is often an afterthought. Defining these roles at the outset of your project helps you accurately estimate the work effort.

Your stakeholder groups may include:

  • An executive sponsor
  • A steering committee
  • A project manager
  • Functional leads
  • A technical team

Once you’ve established the necessary roles, you can begin reviewing your organization’s resources to determine the people who will be available to fill them. Planning for resource availability will help you avoid delays, minimize impact to regular business processes, and reduce the likelihood of burnout. But this plan won’t remain static—you can expect to make updates throughout the project.

Establish clear goals and objectives to keep your technology project on track

It’s important that an enterprise technology project has established goals and objectives statements. These statements will help inform decision-making, provide benchmarks for progress, and measure your project’s success. They can then be referenced when key stakeholders have differing perspectives on the direction to take with a pending decision. For example, if the objective of your project is to reduce paper-based processes, you may plan for additional computer workstations and focus technical resources on provisioning them. You’ll also be able to measure your success in the reduction of paper-based tasks.

Estimate your IT project budget accurately

Project funding is hardly ever overlooked, but can be complex with project budgets that are either underestimated or estimated without sufficient rationale to withstand approval processes and subsequent budget analysis. You may find that breaking down estimates to a lower level of detail helps address these challenges. Most technology projects incur costs in three key areas:

  • Vendor cost: This could include both one-time software implementation costs as well as recurring costs for maintenance and ongoing support.
  • Infrastructure cost: Consider the cost of any investments needed to support your project, such as data center hardware, networking components, or computing devices.
  • Supplemental resource cost: Don’t forget to include the cost of any additional resources needed for their specialized knowledge or to simply backfill project staff. This could include contracted resources or the additional cost of existing resources (i.e., overtime).

A good technology project budget also includes a contingency amount. This amount will depend on your organization’s standards, the relative level of confidence in your estimates, and the relative risk.

Anticipate the need for change management

Depending on the project, staff in many areas of your organization will be impacted by some level of change during a technology implementation. External stakeholders, such as vendors and the public, may also be affected. You can effectively manage this change by proactively identifying areas of likely change resistance and creating strategies to address them.

In any technology implementation, you will encounter change resistance you did not predict. Having strategies in place will help you react quickly and effectively. Some proven change management strategies include communicating throughout your project, involving stakeholders to get their buy-in, and helping ensure management has the right amount of information to share with their employees.

Maintain focus and stay flexible as you manage your IT project

Even with the most thought-out planning, unforeseen events and external factors may impact your technology project. Establish mechanisms to regularly and proactively monitor project status so that you can address material risks and issues before their impact to the project grows. Reacting to these items as they arise requires key project stakeholders to be flexible. Key stakeholders must recognize that new information does not necessarily mean previous decisions were made in error, and that it is better to adapt than to stick to the initial direction.

Whether you’re implementing an ERP, an EHR, or enterprise human resources or asset management systems, any enterprise technology project is a massive undertaking, involving significant investment and a coordinated effort with individuals across multiple areas of an organization. Common mistakes can be costly, but having a structured approach to your planning can help avoid pitfalls. Our experienced, objective advisors have worked with public and private organizations across the country to oversee large enterprise projects from inception to successful completion.

Contact our software consulting team with any questions.

Article
Planning for a successful enterprise technology project

Read this if your organization, business, or institution has leases and you’ve been eagerly awaiting and planning for the implementation of the new lease standards.

Ready? Set? Not yet. As we have prepared for and experienced delays related to Financial Accounting Standards Board (FASB) Accounting Standards Codification Topic 842, Leases, and Governmental Accounting Standards Board (GASB) Statement No. 87, Leases, we thought the time had finally come for implementation. With the challenges that COVID-19 has brought to everyone, the FASB and GASB recognize the significant impact COVID-19 has had on commercial businesses, state and local governments, and not-for-profits and both have proposed delays in effective dates for various accounting standards, including both lease standards.

But wait, there’s more! In response to feedback FASB received during the comment period for the lease standard, the revenue recognition standard has also been extended. We didn’t see that coming, and expect that many organizations that didn’t opt for early adoption will breathe a collective sigh of relief.

FASB details and a deeper dive

On May 20, 2020, FASB voted to delay the effective date of the lease standard and the revenue recognition standard. A formal Accounting Standards Update (ASU) summarizing these changes will be released early June. Here’s what we know now:

  • Revenue recognition―for entities that have not yet issued financial statements, the effective date of the application of FASB Accounting Standards Codification (ASC) Topic 606, Revenue Recognition, has been delayed by 12 months (effective for reporting periods beginning after December 15, 2019). This does not apply to public entities or nonpublic entities that are conduit debt obligors who previously adopted this guidance.
  • Leases―for entities that have not yet adopted the guidance from ASC 842, Leases, the effective date has been extended by 12 months (effective for reporting periods beginning after December 15, 2021).
  • Early adoption of either standard is still allowed.

FASB has also provided clarity on lease concessions that are highlighted in Topic 842. 

We recognize many lessors are making concessions due to the pandemic. Under current guidance in Topics 840 and 842, changes to lease contracts that were not included in the original lease are generally accounted for as lease modifications and, therefore, a separate contract. This would require remeasurement of the new lease contract and related right-of-use asset. 

FASB recognized this issue and has published a FASB Staff Questions and Answers (Q&A) Document, Topic 842 and Topic 840: Accounting for Lease Concessions Related to the Effects of the COVID-19 Pandemic. Under this new guidance, if lease concessions are made relating to COVID-19, entities do not need to analyze each contract to determine if a new contract has been entered into, and will have the option to apply, or not to apply, the lease modification provisions of Topics 840 and 842.

GASB details

On May 8, 2020, GASB issued Statement No. 95, Postponement of the Effective Dates of Certain Authoritative Guidance. GASB 95 extends the implementation dates of several pronouncements including:
•    Statement No. 84, Fiduciary Activities―extended by 12 months (effective for reporting periods beginning after December 15, 2019)
•    Statement No. 87, Leases―extended by 18 months (effective for reporting periods beginning after June 15, 2021)

More information

If you have questions, please contact a member of our financial statement audit team. For other COVID-19 related resources, please refer to BerryDunn’s COVID-19 Resources Page.
 

Article
May 2020 accounting standard delay status: GASB and FASB

Read this if you are planning for, or are in the process of implementing a new software solution.

User Acceptance Testing (UAT) is more than just another step in the implementation of a software solution. It can verify system functionality, increase the opportunity for a successful project, and create additional training opportunities for your team to adapt to the new software quickly. Independent verification through a structured user acceptance plan is essential for a smooth transition from a development environment to a production environment. 

Verification of functionality

The primary purpose of UAT is to verify that a system is ready to go live. Much of UAT is like performing a pre-flight checklist on an aircraft. Wings... check, engines... check, tires... check. A structured approach to UAT can verify that everything is working prior to rolling out a new software system for everyone to use. 

To hold vendors accountable for their contractual obligations, we recommend an agency test each functional and technical requirement identified in the statement of work portion of their contract. 

It is also recommended that the agency verify the functional and technical requirements that the vendor replied positivity to in the RFP for the system you are implementing. 

Easing the transition to a new software

Operational change management (OCM) is a term that describes a methodology for making the switch to a new software solution. Think of implementing a new software solution like learning a new language. For some employees, the legacy software solution is the only way they know how to do their job. Like learning a new language, changing the way business and learning a new software can be a challenging and scary task. The benefits outweigh the anxiety associated with learning a new language. You can communicate with a broader group of people, and maybe even travel the world! This is also true for learning a new software solution; there are new and exciting ways to perform your job.

Throughout all organizations there will be some employees resistant to change. Getting those employees involved in UAT can help. By involving them in testing the new system and providing feedback prior to implementation, they will feel ownership and be less likely to resist the change. In our experience, some of the most resistant employees, once involved in the process, become the biggest champions of the new system.  

Training and testing for better results

On top of the OCM and verification benefits a structured UAT can accomplish, UAT can be a great training opportunity. An agency needs to be able to perform actions of the tested functionality. For example, if an agency is testing a software’s ability to import a document, then a tester needs to be trained on how to do that task. By performing this task, the tester learns how to login to the software, navigate the software, and perform tasks that the end user will be accomplishing in their daily use of the new software. 

Effective UAT and change management

We have observed agencies that have installed software that was either not fully configured or the final product was not what was expected when the project started. The only way to know that software works how you want is to test it using business-driven scenarios. BerryDunn has developed a UAT process, customizable to each client, which includes a UAT tracking tool. This process and related tool helps to ensure that we inspect each item and develop steps to resolve issues when the software doesn’t function as expected. 

We also incorporate change management into all aspects of a project and find that the UAT process is the optimal time to do so. Following established and proven approaches for change management during UAT is another opportunity to optimize implementation of a new software solution. 

By building a structured approach to UAT, you can enjoy additional benefits, as additional training and OCM benefits can make the difference between forming a positive or a negative reaction to the new software. By conducting a structured and thorough UAT, you can help your users gain confidence in the process, and increase adoption of the new software. 

Please contact the team if you have specific questions relating to your specific needs, or to see how we can help your agency validate the new system’s functionality and reduce resistance to the software. We’re here to help.   
 

Article
User Acceptance Testing: A plan for successful software implementation

The BerryDunn Recovery Advisory Team has compiled this guide to COVID-19 consulting resources for state and local government agencies and higher education institutions.

We have provided a list of our consulting services related to data analysis, CARES Act funding and procurement, and legislation and policy implementation. Many of these services can be procured via the NASPO ValuePoint Procurement Acquisition Support Services contract.

READ THE GUIDE NOW

We're here to help.
If you have any questions, please contact us at info@berrydunn.com

Article
COVID-19 consulting resources

Read this if your organization, business, or institution has leases and you’ve been eagerly awaiting and planning for the implementation of the new lease standards.

Ready? Set? Not yet. As we have prepared for and experienced delays related to Financial Accounting Standards Board (FASB) Accounting Standards Codification Topic 842, Leases, we thought the time had finally come for implementation. With the challenges that COVID-19 has brought to everyone, the FASB recognizes the significant impact COVID-19 has brought to commercial businesses and not-for-profits and is proposing a one-year delay in implementation, as described in this article posted to the Journal of Accountancy: FASB effective date delay proposals to include private company lease accounting.

But what about lease concessions? We all recognize many lessors are making concessions due to the pandemic. Under current guidance in Topics 840 and 842, changes to lease contracts that were not included in the original lease are generally accounted for as lease modifications and, therefore, a separate contract. This would require remeasurement of the new lease contract and related right-of-use asset. FASB recognized this issue and has published a FASB Staff Questions and Answers (Q&A) Document,  Topic 842 and Topic 840: Accounting for Lease Concessions Related to the Effects of the COVID-19 Pandemic. Under this new guidance, if lease concessions are made relating to COVID-19, entities do not need to analyze each contract to determine if a new contract has been entered into, and will have the option to apply, or not to apply, the lease modification provisions of Topics 840 and 842.

Implementation of the lease accounting standard will most likely be delayed for Governmental Accounting Standards Board (GASB) entities as well. On April 15, 2020, the GASB issued an exposure draft that would delay most GASB statements and implementation guides due to be implemented for fiscal years 2019 and later. Most notably, this includes Statement 84, Fiduciary Activities, and Statement 87, Leases. Comments on the proposal will be accepted through April 30, and the board plans to consider a final statement for issuance on May 8. More information may be found in this article from the Journal of Accountancy: GASB proposes postponing effective dates due to pandemic.

More information

Whether you are a FASB or GASB entity, you can expect a delay in the implementation of the lease standard. If you have questions, please contact a member of our financial statement audit team. For other COVID-19 related resources, please refer to BerryDunn’s COVID-19 Resources Page.

Article
FASB and GASB news: Postponement of the lease accounting standards

A version of this article was previously published on the Massachusetts Nonprofit Network

Editor’s note: While this article is not technical in nature, you should read it if you are involved in IT security, auditing, and management of organizations that may participate in strategic planning and business activities where considerations of compliance and controls is required.

As we find ourselves in a fast-moving, strong business growth environment, there is no better time to consider the controls needed to enhance your IT security as you implement new, high-demand technology and software to allow your organization to thrive and grow. Here are five risks you need to take care of if you want to build or maintain strong IT security.

1. Third-party risk management―It’s still your fault

We rely daily on our business partners and vendors to make the work we do happen. With a focus on IT, third-party vendors are a potential weak link in the information security chain and may expose your organization to risk. However, though a data breach may be the fault of a third-party, you are still responsible for it. Potential data breaches and exposure of customer information may occur, leaving you to explain to customers and clients answers and explanations you may not have. 

Though software as a service (SaaS) providers, along with other IT third-party services, have been around for well over a decade now, we still neglect our businesses by not considering and addressing third-party risk. These third-party providers likely store, maintain, and access company data, which could potentially contain personally identifiable information (names, social security numbers, dates of birth, addresses), financial information (credit cards or banking information), and healthcare information of your customers. 

While many of the third-party providers have comprehensive security programs in place to protect that sensitive information, a study in 2017 found that 30% of data breaches were caused by employee error or while under the control of third-party vendors.1  This study reemphasizes that when data leaves your control, it is at risk of exposure. 

In many cases, procurement and contracting policies likely have language in contracts that already establish requirements for third-parties related to IT security; however the enforcement of such requirements and awareness of what is written in the contract is not enforced or is collected, put in a file, and not reviewed. What can you do about it?

Improved vendor management

It is paramount that all organizations (no matter their size) have a comprehensive vendor management program that goes beyond contracting requirements in place to defend themselves against third-party risk which includes:

  1. An inventory of all third-parties used and their criticality and risk ranking. Criticality should be assigned using a “critical, high, medium or low” scoring matrix. 
  2. At time of onboarding or RFP, develop a standardized approach for evaluating if potential vendors have sufficient IT security controls in place. This may be done through an IT questionnaire, review of a Systems and Organization Controls (SOC report) or other audit/certifications, and/or policy review. Additional research may be conducted that focuses on management and the company’s financial stability. 
  3. As a result of the steps in #2, develop a vendor risk assessment using a high, medium and low scoring approach. Higher risk vendors should have specific concerns addressed in contracts and are subject to more in depth annual due diligence procedures. 
  4. Reporting to senior management and/or the board annually on the vendors used by the organization, the services they perform, their risk, and ways the organization monitors the vendors. 

2. Regulation and privacy laws―They are coming 

2018 saw the implementation of the European Union’s General Data Privacy Regulation (GDPR) which was the first major data privacy law pushed onto any organization that possesses, handles, or has access to any citizen of EU’s personal information. Enforcement has started and the Information Commissioner’s Office has begun fining some of the world’s most famous companies, including substantial fines to Marriott International and British Airways of $125 million and $183 million Euros, respectively.2  Gone are the days where regulations lacked the teeth to force companies into compliance. 

With thanks to other major data breaches where hundreds of millions’ consumers private information was lost or obtained (e.g., Experian), more regulation is coming. Although there is little expectation of an American federal requirement for data protection, individual states and other regulating organizations are introducing requirements. Each new regulation seeks to protect consumer privacy but the specifics and enforcement of each differ. 

Expected to be most impactful in 2019 is the California Consumer Privacy Act,  which applies to organizations that handle, collect, or process consumer information and do business in the state of California (you do not have to be located in CA to be under the umbrella of enforcement).

In 2018, Maine passed the toughest law on telecommunications providers for selling consumer information. Massachusetts’ long standing privacy and data breach laws were amended with stronger requirements in January of 2019. Additional privacy and breach laws are in discussion or on the table for many states including Colorado, Delaware, Ohio, Oregon, Ohio, Vermont, and Washington, amongst others.      

Preparation and awareness are key

All organizations, no matter your line of business must be aware of and understand current laws and proposed legislation. New laws are expected to not only address the protection of customer data, but also employee information. All organizations should monitor proposed legislation and be aware of the potential enforceable requirements. The good news is that there are a lot of resources out there and, in most cases, legislative requirements allow for grace periods to allow organizations to develop a complete understanding of proposed laws and implement needed controls. 

3. Data management―Time to cut through the clutter 

We all work with people who have thousands of emails in their inbox (in some cases, dating back several years). Those users’ biggest fears may start to come to fruition―that their “organizational” approach of not deleting anything may come to an end with a simple email and data retention policy put in place by their employer. 

The amount of data we generate in a day is massive. Forbes estimates that we generate 2.5 quintillion bytes of data each day and that 90% of all the world’s data was generated in the last two years alone.3 While data is a gold mine for analytics and market research, it is also an increasing liability and security risk. 

Inc. Magazine says that 73% of the data we have available to us is not used.4 Within that data could be personally identifiable information (such as social security numbers, names, addresses, etc.); financial information (bank accounts, credit cards etc.); and/or confidential business data. That data is valuable to hackers and corporate spies and in many cases data’s existence and location is unknown by the organizations that have it. 

In addition to the security risk that all this data poses, it also may expose an organization to liability in the event of a lawsuit of investigation. Emails and other communications are a favorite target of subpoenas and investigations and should be deleted within 90 days (including deleted items folders). 

Take an inventory before you act

Organizations should first complete a full data inventory and understand what types of data they maintain and handle, and where and how they store that data. Next, organizations can develop a data retention policy that meets their needs. Utilizing backup storage media may be a solution that helps reduce the need to store and maintain a large amount of data on internal systems. 

4. Doing the basics right―The simple things work 

Across industries and regardless of organization size, the most common problem we see is the absence of basic controls for IT security. Every organization, no matter their size, should work to ensure they have controls in place. Some must-haves:

  • Established IT security policies
  • Routine, monitored patch management practices (for all servers and workstations)
  • Change management controls (for both software and hardware changes)
  • Anti-virus/malware on all servers and workstations
  • Specific IT security risk assessments 
  • User access reviews
  • System logging and monitoring 
  • Employee security training

Go back to the basics 

We often see organizations that focus on new and emerging technologies, but have not taken the time to put basic security controls in place. Simple deterrents will help thwarting hackers. I often tell my clients a locked car scares away most ill-willed people, but a thief can still smash the window.  

Smaller organizations can consider using third-party security providers, if they are not able to implement basic IT security measures. From our experience, small organizations are being held to the same data security and privacy expectations by their customers as larger competitors and need to be able to provide assurance that controls are in place.  

5. Employee retention and training 

Unemployment rates are at an all-time low, and the demand for IT security experts at an all-time high. In fact, Monster.com reported that in 2019 the unemployment rate for IT security professionals is 0%.5 

Organizations should be highly focused on employee retention and training to keep current employees up-to-speed on technology and security trends. One study found that only 15% of IT security professionals were not looking to switch jobs within one year.6  

Surprisingly, money is not the top factor for turnover―68% of respondents prioritized working for a company that takes their opinions seriously.6 

For years we have told our clients they need to create and foster a culture of security from the top down, and that IT security must be considered more than just an overhead cost. It needs to align with overall business strategy and goals. Organizations need to create designated roles and responsibilities for security that provide your security personnel with a sense of direction―and the ability to truly protect the organization, their people, and the data. 

Training and support goes a long way

Offering training to security personnel allows them to stay abreast of current topics, but it also shows those employees you value their knowledge and the work they do. You need to train technology workers to be aware of new threats, and on techniques to best defend and protect from such risks. 

Reducing turnover rate of IT personnel is critical to IT security success. Continuously having to retrain and onboard employees is both costly and time-consuming. High turnover impacts your culture and also hampers your ability to grow and expand a security program. 

Making the effort to empower and train all employees is a powerful way to demonstrate your appreciation and support of the employees within your organization—and keep your data more secure.  

Our IT security consultants can help

Ensuring that you have a stable and established IT security program in place by considering the above risks will help your organization adapt to technology changes and create more than just an IT security program, but a culture of security minded employees. 

Our team of IT security and control experts can help your organization create and implement controls needed to consider emerging IT risks. For more information, contact the team
 

Sources:
[1] https://iapp.org/news/a/surprising-stats-on-third-party-vendor-risk-and-breach-likelihood/  
[2] https://resources.infosecinstitute.com/first-big-gdpr-fines/
[3] https://www.forbes.com/sites/bernardmarr/2018/05/21/how-much-data-do-we-create-every-day-the-mind-blowing-stats-everyone-should-read/#458b58860ba9
[4] https://www.inc.com/jeff-barrett/misusing-data-could-be-costing-your-business-heres-how.html
[5] https://www.monster.com/career-advice/article/tech-cybersecurity-zero-percent-unemployment-1016
[6] https://www.securitymagazine.com/articles/88833-what-will-improve-cyber-talent-retention

Article
Five IT risks everyone should be aware of