Outcomes and APD considerations

03.03.21

Read this if you are a State Medicaid Director, State Medicaid Chief Information Officer, State Medicaid Project Manager, or State Procurement Officer—or if you work on a State Medicaid Enterprise System (MES) certification or modernization efforts.

Over the last two years, the Centers for Medicare and Medicaid Services (CMS) has undertaken an effort to streamline MES certification. During this time, we have been fortunate enough to be a trusted partner in several states working to evolve the certification process. Through this collaboration with CMS and state partners, we have been in front of recent certification trends. The content we are covering is based on our experience supporting states with efforts related to CMS certification. We do not speak for CMS, nor do we have the authority to do so.

How does the focus on outcomes impact the way states think about funding for their Medicaid Enterprise Systems (MESs)?

Outcomes are becoming an integral part of states’ MES modernization efforts. We can see this on display in recent preliminary CMS guidance. CMS has advised states to begin incorporating outcome statements and metrics into APDs, Requests for Proposals (RFPs), and supporting vendor contracts.

Outcomes and metrics allow states and federal partners to have more informed discussions about the business needs that states hope to achieve with their Medicaid IT systems. APDs will likely take on a renewed importance as states incorporate outcomes and metrics to demonstrate the benefits of their Medicaid IT systems.

What does this renewed importance mean for states as they prepare their APD submissions?

As we’ve seen with initial OBC pilots, enhanced operations funding depends upon the system’s ability to satisfy certification outcomes and Key Performance Indicators (KPIs). 

Notably, states should also prepare to incorporate outcomes into all APD submissions—including updates to previously approved active APDs that did not identify outcomes in the most recent submission. 
 
This will likely apply to all stages of a project’s lifecycle—from system planning and procurement through operations. Before seeking funding for new IT systems, states should be able to effectively explain how the project would lead to tangible benefits and outcomes for the Medicaid program.

How do outcome statements align with and complement what we are seeing with outcomes-based or streamlined modular certification efforts?

Outcomes are making their way into funding and contracting vehicles and this really captures the scaling we discussed in our last conversation. States need to start thinking about reprocurement and modernization projects in terms of business goals, organizational development, and business process improvement and redesign. What will a state get out of the new technology that they do not get today? States need to focus more on the business needs and less on the technical requirements.

Interestingly, what we are starting to see is the idea that the certification outcomes are not going to be sufficient to warrant enhanced funding matches from CMS. Practically, this means states should begin thinking critically about want they want out of their Medicaid IT procurements as they look to charter those efforts.

We have even started to see CMS return funding and contracting vehicles to states with guidance that the outcomes aren’t really sufficiently conveying what tangible benefit the state hopes to achieve. Part of this challenge is understanding what an outcome actually is. States are used to describing those technical requirements, but those are really system outputs, not program outcomes.

What exactly is an outcome and what should states know when developing meaningful outcomes?

As states begin developing outcomes for their Medicaid IT projects, it will be important to distinguish between outcomes and outputs for the Medicaid program. If you think about programs, broadly speaking, they aim to achieve a desired outcome by taking inputs and resources, performing activities, and generating outputs.

As a practical example, we can think about the benefits associated with health and exercise programs. If a person wants to improve their overall health and wellbeing, they could enroll in a health and exercise program. By doing so, this person would likely need to acquire new resources, like healthy foods and exercise equipment. To put those resources to good use, this person would need to engage in physical exercise and other activities. These resources and activities will likely, over time, lead to improved outputs in that person’s heart rate, body weight, mood, sleeping patterns, etc.
 
In this example, the desired outcome is to improve the person’s overall health and wellbeing. This person could monitor their progress by measuring their heart rates over time, the amount of sleep they receive each night, or fluctuations in their body weight—among others. These outputs and metrics all support the desired outcome; however, none of the outputs alone improves this person’s health and wellbeing.

States should think of outcomes as the big-picture benefits they hope to achieve for the Medicaid program. Sample outcomes could include improved eligibility determination accuracy, increased data accessibility for beneficiaries, and timely management of fraud, waste, and abuse.
 
By contrast, outputs should be thought of as the immediate, direct result of the Medicaid program’s activities. One example of an output might be the amount of time required to enroll providers after their initial application. To develop meaningful outcomes for their Medicaid program, states will need to identify big-picture benefits, rather than immediate results. With this is mind, states can develop outcomes to demonstrate the value of their Medicaid IT systems and identify outputs that help achieve their desired outcomes.

What are some opportunities states have in developing outcomes for their MES modernizations?

The opportunities really begin with business process improvement. States can begin by taking a critical look at their current state business processes and understanding where their challenges are. Payment and enrollment error rates or program integrity-related challenges may be obvious starting points; however, drilling down further into the day-to-day can give an even more informed understanding of your business needs. Do your staff end users have manual and/or duplicative processes or even process workarounds (e.g., entering the same data multiple times, entering data into one system that already exists in another, using spreadsheets to track information because the MES can’t accommodate a new program, etc.)? Is there a high level of redundancy? Some of those types of questions start to get at the heart of meaningful improvement.

Additionally, states need to be aware of the people side of change. The shift toward an outcomes-based environment is likely going to place greater emphasis on organizational change management and development. In that way, states can look at how they prepare their workforce to optimize these new technologies.

The certification landscape is seemingly changing weekly as states wait eagerly for CMS’ next guidance issuances. Please continue to check back for in-depth analyses and OBC success stories. Additionally, if you are considering an OBC effort and have questions, please contact our Medicaid Consulting team

Related Industries

Related Professionals

Principals

BerryDunn experts and consultants

There’s a good chance that your organization is in the position of needing to do more with less under the strain of staffing constraints and competing initiatives. With fewer resources to work with, you’ll need to be persuasive to get the green light on new enterprise technology initiatives. To do that, you need to present decision makers with well-thought-out and targeted business cases that show your initiative will have impact and will be successful. Yet developing such a business case is no walk in the park. Perhaps because our firm has its roots in New England, we sometimes compare this process to leading a hiking trip into the woods—into the wild. 

Just as in hiking, success in developing a business case for a new initiative boils down to planning, preparation, and applying a few key concepts we’ve learned from our travels. 

Consensus is critical when planning new technology initiatives

Before you can start the hike, everyone has to agree on some fundamentals: 

Who's going? 

Where are we going? 

When do we go and for how long? 

Getting everyone to agree requires clear communication and, yes, even a little salesmanship: “Trust me. The bears aren’t bad this time of year.” The same principle applies in proposing new technology initiatives; making sure everyone has bought into the basic framework of the initiative is critical to success.

Although many hiking trips involve groups of people similar in age, ability, and whereabouts, for your business initiative you need to communicate with diverse groups of colleagues at every level of the organization. Gaining consensus among people who bring a wide variety of skills and perspectives to the project can be complex.

To gain consensus, consider the intended audiences of your message and target the content to what will work for them. It should provide enough information for executive-level stakeholders to quickly understand the initiative and the path forward. It should give people responsible for implementation or who will provide specific skills substantive information to implement the plan. And remember: one of the most common reasons projects struggle to meet their stated objectives (and why some projects never materialize to begin with), is a lack of sponsorship and buy-in. The goal of a business case is to gain buy-in before project initiation, so your sponsors will actively support the project during implementation. 

Set clear goals for your enterprise technology project 

It’s refreshing to take the first steps, to feel that initial sense of freedom as you set off down the trail. Yet few people truly enjoy wandering around aimlessly in the wilderness for an extended period of time. Hikers need goals, like reaching a mountain peak or seeing famous landmarks, or hiking a predetermined number of miles per day. And having a trail guide is key in meeting those goals. 

For a new initiative, clearly define goals and objectives, as well as pain points your organization wishes to address. This is critical to ensuring that the project’s sponsors and implementation team are all on the same page. Identifying specific benefits of completing your initiative can help people keep their “eyes on the prize” when the project feels like an uphill climb.

Timelines provide additional detail and direction—and demonstrate to decision makers that you have considered multiple facets of the project, including any constraints, resource limitations, or scheduling conflicts. Identifying best practices to incorporate throughout the initiative enhances the value of a business case proposition, and positions the organization for success. By leveraging lessons learned on previous projects, and planning for and mitigating risk, the organization will begin to clear the path for a successful endeavor. 

Don’t compromise on the right equipment

Hiking can be an expensive, time-consuming hobby. While the quality of your equipment and the accuracy of your maps are crucial, you can do things with limited resources if you’re careful. Taking the time to research and purchase the right equipment, (like the right hiking boots), keeps your fun expedition from becoming a tortuous slog. 

Similarly, in developing a business case for a new initiative, you need to make sure that you identify the right resources in the right areas. We all live with resource constraints of one sort or another. The process of identifying resources, particularly for funding and staffing the project, will lead to fewer surprises down the path. As many government employees know all too well, it is better to be thorough in the budget planning process than to return to authorizing sources for additional funding while midstream in a project. 

Consider your possible outcomes

You cannot be too singularly focused in the wild; weather conditions change quickly, unexpected opportunities reveal themselves, and being able to adapt quickly is absolutely necessary in order for everyone to come home safely. Sometimes, you should take the trail less traveled, rest in the random lean-to that you and your group stumble upon, or go for a refreshing dip in a lake. By focusing on more than just one single objective, it often leads to more enjoyable, safe, and successful excursions.

This type of outlook is necessary to build a business case for a new initiative. You may need to step back during your initial planning and consider the full impact of the process, including on those outside your organization. For example, you may begin to identify ways in which the initiative could benefit both internal and external stakeholders, and plan to move forward in a slightly new direction. Let’s say you’re building a business case for a new land management and permitting software system. Take time to consider that this system may benefit citizens, contractors, and other organizations that interact with your department. This new perspective can help you strengthen your business case. 

Expect teamwork

A group that doesn’t practice teamwork won’t last long in the wild. In order to facilitate and promote teamwork, it’s important to recognize the skills and contributions of each and every person. Some have a better sense of direction, while some can more easily start campfires. And if you find yourself fortunate enough to be joined by a truly experienced hiker, make sure that you listen to what they have to say.

Doing the hard work to present a business case for a new initiative may feel like a solitary action at times, but it’s not. Most likely, there are other people in your organization who see the value in the initiative. Recognize and utilize their skills in your planning. We also suggest working with an experienced advisor who can leverage best practices and lessons learned from similar projects. Their experience will help you anticipate potential resistance and develop and articulate the mitigation strategies necessary to gain support for your initiative.

If you have thoughts, concerns, or questions, contact our team. We love to discuss the potential and pitfalls of new initiatives, and can help prepare you to head out into the wild. We’d love to hear any parallels with hiking and wilderness adventuring that you have as well. Let us know! 

BerryDunn’s local government consulting team has the experience to lead technology planning initiatives and develop actionable plans that help you think strategically and improve service delivery. We partner with you, maintaining flexibility and open lines of communication to help ensure that your team has the resources it needs.

Our team has broad and deep experience partnering with local government clients across the country to modernize technology-based business transformation projects and the decision-making and planning efforts. Our expertise includes software system assessments/planning/procurement and implementation project management; operational, management, and staffing assessments; information security; cost allocation studies; and data management.  

Article
Into the wild: Building a business case for a new enterprise technology project

Read this if your company is considering outsourced information technology services.

For management, it’s the perennial question: Keep things in-house or outsource?

For management, it’s the perennial question: Keep things in-house or outsource? Most companies or organizations have outsourcing opportunities, from revenue cycle to payment processing to IT security. When deciding whether to outsource, you weigh the trade-offs and benefits by considering variables such as cost, internal expertise, cross coverage, and organizational risk.

In IT services, outsourcing may win out as technology becomes more complex. Maintaining expertise and depth for all the IT components in an environment can be resource-intensive.

Outsourced solutions allow IT teams to shift some of their focus from maintaining infrastructure to getting more value out of existing systems, increasing data analytics, and better linking technology to business objectives. The same can be applied to revenue cycle outsourcing, shifting the focus from getting clean bills out and cash coming in, to looking at the financial health of the organization, analyzing service lines, patient experience, or advancing projects.  

Once you’ve decided, there’s another question you need to ask
Lost sometimes in the discussion of whether to use outsourced services is how. Even after you’ve done your due diligence and chosen a great vendor, you need to stay involved. It can be easy to think, “Vendor XYZ is monitoring our servers or our days in AR, so we should be all set. I can stop worrying at night about our system reliability or our cash flow.” Not true.

You may be outsourcing a component of your technology environment or collections, but you are not outsourcing the accountability for it—from an internal administrative standpoint or (in many cases) from a legal standpoint.

Beware of a false state of confidence
No matter how clear the expectations and rules of engagement with your vendor at the onset of a partnership, circumstances can change—regulatory updates, technology advancements, and old-fashioned vendor neglect. In hiring the vendor, you are accountable for oversight of the partnership. Be actively engaged in the ongoing execution of the services. Also, periodically revisit the contract, make sure the vendor is following all terms, and confirm (with an outside audit, when appropriate) that you are getting the services you need.

Take, for example, server monitoring, which applies to every organization or company, large or small, with data on a server. When a managed service vendor wants to contract with you to provide monitoring services, the vendor’s salesperson will likely assure you that you need not worry about the stability of your server infrastructure, that the monitoring will catch issues before they occur, and that any issues that do arise will be resolved before the end user is impacted. Ideally, this is true, but you need to confirm.

Here’s how to stay involved with your vendor
Ask lots of questions. There’s never a question too small. Here are samples of how precisely you should drill down:

  • What metrics will be monitored, specifically?
  • Why do the metrics being monitored matter to our own business objectives?
  • What thresholds must be met to notify us or produce an alert?
  • What does exceeding a threshold mean to our business?
  • Who on our team will be notified if an alert is warranted?
  • What corrective action will be taken?

Ask uncomfortable questions
Being willing to ask challenging questions of your vendors, even when you are not an expert, is critical. You may feel uncomfortable but asking vendors to explain something to you in terms you understand is very reasonable. They’re the experts; you’re not expected to already understand every detail or you wouldn’t have needed to hire them. It’s their job to explain it to you. Without asking these questions, you may end up with a fairly generic solution that does produce a service or monitor something, but not necessarily all the things you need.

Ask obvious questions
You don’t want anything to slip by simply because you or the vendor took it for granted. It is common to assume that more is being done by a vendor than actually is. By asking even obvious questions, you can avoid this trap. All too often we conduct an IT assessment and are told that a vendor is providing a service, only to discover that the tasks are not happening as expected.

You are accountable for your whole team—in-house and outsourced members
An outsourced solution is an extension of your team. Taking an active and engaged role in an outsourcing partnership remains consistent with your management responsibilities. At the end of the day, management is responsible for achieving business objectives and mission. Regularly check in to make sure that the vendor stays focused on that same mission.

Article
Oxymoron of the month: Outsourced accountability

Read this if you are a police executive, city/county administrator, or elected government official, responsible for a law enforcement agency. 

“We need more cops!”  

Do your patrol officers complain about being short-staffed or too busy, or that they are constantly running from call to call? Does your agency struggle with backed-up calls for service (CFS) or lengthy response times? Do patrol staff regularly find themselves responding to another patrol area to handle a CFS because the assigned officer is busy on another call? Are patrol officers denied leave time or training opportunities because of staffing issues? Does the agency routinely use overtime to cover predictable shift vacancies for vacations, holidays, or training? 

If one or more of these concerns sound familiar, you may need additional patrol resources, as staffing levels are often a key factor in personnel deployment challenges. Flaws in the patrol schedule design may also be responsible, as they commonly contribute to reduced efficiency and optimal performance, and design issues may be partially responsible for some of these challenges, regardless of authorized staffing levels.
 
With community expectations at an all-time high, and resource allocations remaining relatively flat, many agencies have growing concerns about managing increasing service volumes while controlling quality and building/maintaining public trust and confidence. Amid these concerns, agencies struggle with designing work schedules that efficiently and optimally deploy available patrol resources, as patrol staff become increasingly frustrated at what they consider a lack of staff.

The path to resolving inefficiencies in your patrol work schedule and optimizing the effective deployment of patrol personnel requires thoughtful consideration of several overarching goals:

  • Reducing or eliminating predictable overtime
  • Eliminating peaks and valleys in staffing due to scheduled leave
  • Ensuring appropriate staffing levels in all patrol zones or beats
  • Providing sufficient staff to manage multiple and priority CFS in patrol zones or beats
  • Satisfying both operational and staff needs, including helping to ensure a proper work/life balance and equitable workloads for patrol staff

Scheduling alternatives

One common design issue that presents an ongoing challenge for agencies is the continued use of traditional, balanced work schedules, which spread officer work hours equally over the year. Balanced schedules rely on over-scheduling and overtime to manage personnel allocation and leave needs and, by design, are very rigid. Balanced work schedules have been used for a very long time, not because they’re most efficient, but because they’re common, familiar, and easily understood―and because patrol staff are comfortable with them (and typically reluctant to change). However, short schedules offer a proven alternative to balanced patrol work schedules, and when presented with the benefits of an alternative work schedule design (e.g., increased access to back-up, ease of receiving time off or training, consistency in staffing, less mandatory overtime), many patrol staff are eager to change.

Short schedules

Short schedules involve a more contemporary design that includes a flexible approach that focuses on a more adaptive process of allocating personnel where and when they are needed. They are significantly more efficient than balanced schedules and, when functioning properly, they can dramatically improve personnel deployments, bring continuity to daily staffing, and reduce overtime, among other operational benefits. Given the current climate, most agencies are unlikely to receive substantial increases in personnel allocations. If that is true of your agency, it may be time to explore the benefits of alternative patrol work schedules.

A tool you can use

Finding scheduling strategies that work in this climate requires an intentional approach, customized to your agency’s characteristics (e.g., staffing levels, geographic factors, crime rates, zone/beat design, contract/labor rules). To help guide you through this process, BerryDunn has developed a free tool for evaluating patrol schedules. Click here to measure your patrol schedule against key design components and considerations.

If you are curious about alternative patrol work schedules, our dedicated justice and public Safety consultants are available to discuss your organization’s needs.

Article
Efficient police patrol work schedules―By design

As your organization works to modernize and improve your Medicaid Enterprise System (MES), are you using independent verification and validation (IV&V) to your advantage? Does your relationship with your IV&V provider help you identify high-risk project areas early, or provide you with an objective view of the progress and quality of your MES modernization initiative? Maybe your experience hasn’t shown you the benefits of IV&V. 

If so, as CMS focuses on quality outcomes, there may be opportunities for you to leverage IV&V in a way that can help advance your MES to increase the likelihood of desired outcomes for your clients. 

According to 45 Code of Federal Regulations (CFR) § 95.626, IV&V may be required for Advanced Planning Document (APD) projects that meet specific criteria. That said, what is the intended role and benefit of IV&V? 

To begin, let’s look at the meaning of “verification” and “validation.” The Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard for Software Verification and Validation (1012-1998) defines verification as, “confirmation of objective evidence that the particular requirements for a specific intended use are fulfilled.” Validation is “confirmation of objective evidence that specified requirements have been fulfilled.” 

Simply put, verification and validation ensure the right product is built, and the product is built right. 
As an independent third party, IV&V should not be influenced by any vendor or software application. This objectivity means IV&V’s perspective is focused on benefiting your organization. This support includes: 

  • Project management processes and best practices support to help increase probability of project success
  • Collaboration with you, your vendors, and stakeholders to help foster a positive and efficient environment for team members to interact 
  • Early identification of high-risk project areas to minimize impact to schedule, cost, quality, and scope 
  • Objective examination of project health in order for project sponsors, including the federal government, to address project issues
  • Impartial analysis of project health that allows state management to make informed decisions 
  • Unbiased visibility into the progress and quality of the project effort to increase customer satisfaction and reduce the risk and cost of rework
  • Reduction of errors in delivered products to help increase productivity of staff, resulting in a more efficient MES 

Based on our experience, when a trusted relationship exists between state governments and IV&V, an open, collaborative dialogue of project challenges—in a non-threatening manner—allows for early resolution of risks. This leads to improved quality of MES outcomes.    

Is your IV&V provider helping you advance the quality of your MES? Contact our team.

Article
Leveraging IV&V to achieve quality outcomes

Best practices for financial institution contracts with technology providers

As the financial services sector moves in an increasingly digital direction, you cannot overstate the need for robust and relevant information security programs. Financial institutions place more reliance than ever on third-party technology vendors to support core aspects of their business, and in turn place more reliance on those vendors to meet the industry’s high standards for information security. These include those in the Gramm-Leach-Bliley Act, Sarbanes Oxley 404, and regulations established by the Federal Financial Institutions Examination Council (FFIEC).

On April 2, 2019, the FDIC issued Financial Institution Letter (FIL) 19-2019, which outlines important requirements and considerations for financial institutions regarding their contracts with third-party technology service providers. In particular, FIL-19-2019 urges financial institutions to address how their business continuity and incident response processes integrate with those of their providers, and what that could mean for customers.

Common gaps in technology service provider contracts

As auditors of IT controls, we review lots of contracts between financial institutions and their technology service providers. When it comes to recommending areas for improvement, our top observations include:

  • No right-to-audit clause
    Including a right-to-audit clause encourages transparency and provides greater assurance that vendors are providing services, and charging for them, in accordance with their contract.
  • Unclear and/or inadequate rights and responsibilities around service disruptions
    In the event of a service incident, time and transparency are vital. Contracts that lack clear and comprehensive standards, both for the vendor and financial institution, regarding business continuity and incident response expose institutions to otherwise avoidable risk, including slow or substandard communications.
  • No defined recovery standards
    Explicitly defined recovery standards are essential to ensuring both parties know their role in responding and recovering from a disaster or other technology outage.

FIL-19-2019 also reminds financial institutions that they need to properly inform regulators when they undertake contracts or relationships with technology service providers. The Bank Service Company Act requires financial institutions to inform regulators in writing when receiving third-party services like sorting and posting of checks and deposits, computation and posting of interest, preparation and mailing of statements, and other functions involving data processing, Internet banking, and mobile banking services.

Writing clearer contracts that strengthen your institution

Financial institutions should review their contracts, especially those that are longstanding, and make necessary updates in accordance with FDIC guidelines. As operating environments continue to evolve, older contracts, often renewed automatically, are particularly easy to overlook. You also need to review business continuity and incident response procedures to ensure they address all services provided by third-parties.

Senior management and the Board of Directors hold ultimate responsibility for managing a financial institution’s relationship with its technology service providers. Management should inform board members of any and all services that the institution receives from third-parties to help them better understand your operating environment and information security needs.

Not sure what to look for when reviewing contracts? Some places to start include:

  • Establish your right-to-audit
    All contracts should include a right-to-audit clause, which preserves your ability to access and audit vendor records relating to their performance under contract. Most vendors will provide documentation of due diligence upon request, such as System and Organization Control (SOC) 1 or 2 reports detailing their financial and IT security controls.

    Many right-to-audit clauses also include a provision allowing your institution to conduct its own audit procedures. At a minimum, don’t hesitate to perform occasional walk-throughs of your vendor’s facilities to confirm that your contract’s provisions are being met.
  • Ensure connectivity with outsourced data centers
    If you outsource some or all of your core banking systems to a hosted data center, place added emphasis on your institution’s business continuity plan to ensure connectivity, such as through the use of multiple internet or dedicated telecommunications circuits. Data vendors should, by contract, be prepared to assist with alternative connectivity.
  • Set standards for incident response communications 
    Clear expectations for incident response are crucial  to helping you quickly and confidently manage the impact of a service incident on your customers and information systems. Vendor contracts should include explicit requirements for how and when vendors will communicate in the event of any issue or incident that affects your ability to serve your customers. You should also review and update contracts after each incident to address any areas of dissatisfaction with vendor communications.
  • Ensure regular testing of defined disaster recovery standards
    While vendor contracts don’t need to detail every aspect of a service provider’s recovery standards, they should ensure those standards will meet your institution’s needs. Contracts should guarantee that the vendor periodically tests, reviews, and updates their recovery standards, with input from your financial institution.

    Your data center may also offer regular disaster recovery and failover testing. If they do, your institution should participate in it. If they don’t, work with the vendor to conduct annual testing of your ability to access your hosted resources from an alternate site.

As financial institutions increasingly look to third-party vendors to meet their evolving technology needs, it is critical that management and the board understand which benefits—and related risks—those vendors present. By taking time today to align your vendor contracts with the latest FFIEC, FDIC, and NCUA standards, your institution will be better prepared to manage risk tomorrow.

For more help gaining control over risk and cybersecurity, see our blog on sustainable solutions for educating your Board of Directors and creating a culture of cybersecurity awareness.
 

Article
Are your vendor contracts putting you at risk?

Editor’s note: If you are a state government CFO, CIO, project or program manager, this blog is for you.

What is the difference in how government organizations procure agile vs. non-agile information technology (IT) services? (Learn more about agile here).

In each case, they typically follow five stages through the process as shown in Figure A:
 

Figure A: Overview of Procurement Process for Agile vs. Non-Agile IT Services

However, there are differences in how these stages are carried out if procuring agile vs. non-agile IT services. 

Unfortunately, most government organizations are unaware of these differences, which could result in unsuccessful procurements and ultimately not meeting your project’s needs and expectations. 
This blog series will illustrate how to strategically adjust the standard stages outlined in Figure A to successfully procure agile IT services.

Stage 1: Plan project
In Stage 1, you define the scope of the project by identifying what your organization wants, needs, and can achieve within the available timeframe and budget. You then determine the project’s objectives while strategically considering their impact on your organization before developing the RFP. Figure B summarizes the key differences between the impacts of agile vs. non-agile services to consider in this stage.


Figure B: Plan Project for Agile vs. Non-Agile IT Services

The nuances of planning for agile services reflect an organization’s readiness for a culture shift to a continuous process of development and deployment of software and system updates. 

Stage 2: Draft RFP
In Stage 2, as part of RFP drafting, define the necessary enhancements and functionality needed to achieve the project objectives determined in Stage 1. You then translate these enhancements and functionalities into business requirements. Requirement types might include business needs as functionality, services, staffing, deliverables, technology, and performance standards. Figure C summarizes the key differences between drafting the RFP for a project procuring agile vs. non-agile services.


Figure C: Draft RFP for Agile vs. Non-Agile IT Services

In drafting the RFP, the scope of work emphasizes expectations for how your team and the vendor team will work together, the terms of how progress will be monitored, and the description of requirements for agile tools and methods.

Stage 3: Issue RFP
In Stage 3, issue the RFP to the vendor community, answer vendor questions, post amendments, and manage the procurement schedule. Since this stage of the process requires you to comply with your organization’s purchasing and procurement rules, Figure D illustrates very little difference between issuing an RFP for a project procuring agile or non-agile services.


Figure D: Issue RFP for Agile vs. Non-Agile IT Services 

Stage 4: Review proposals
In Stage 4, you evaluate vendor proposals against the RFP’s requirements and project objectives to determine the best proposal response. Figure E summarizes the key differences in reviewing proposals for a project that is procuring agile vs. non-agile services.


Figure E: Reviewing Proposals for Agile vs. Non-Agile IT Services 

Having appropriate evaluation priorities and scoring weights that align with how agile services are delivered should not be under-emphasized. 

Stage 5: Award and implement contract
In Stage 5, you award and implement the contract with the best vendor proposal identified during Stage 4. Figure F summarizes the key differences in awarding and implementing the contract for agile vs. non-agile services.


Figure F:  Award and Implement Contract for Agile vs. Non-Agile Services 

Due to the iterative and interactive requirements of agile, it is necessary to have robust and frequent collaboration among program teams, executives, sponsors, and the vendor to succeed in your agile project delivery.

What’s next?
The blog posts in this series will explain step-by-step how to procure agile services through the five stages, and at the series conclusion, your organization will better understand how to successfully procure and implement agile services. If you have questions or comments, please contact our team.  

Article
Procuring agile vs. non-agile projects in five stages: An overview

Truly effective preventive health interventions require starting early, as evidenced by the large body of research and the growing federal focus on the role of Medicaid in addressing Social Determinants of Health (SDoH) and Adverse Childhood Experiences (ACEs).

Focusing on early identification of SDoH and ACEs, CMS recently announced its Integrated Care for Kids (InCK) model and will release the related Notice of Funding Opportunity this fall.

CMS describes InCK as a child-centered approach that uses community-based service delivery and alternative payment models (APMs) to improve and expand early identification, prevention, and treatment of priority health concerns, including behavioral health issues. The model’s goals are to improve child health, reduce avoidable inpatient stays and out-of-home placement, and create sustainable APMs. Such APMs would align payment with care quality and support provider/payer accountability for improved child health outcomes by using care coordination, case management, and mobile crisis response and stabilization services.

State Medicaid agencies have many things to consider when evaluating this funding opportunity. Building on current efforts and innovations, building or leveraging strong partnerships with community organizations, incentivizing evidence-based interventions, and creating risk stratification of the target population are critical parts of the InCK model. Here are three additional areas to consider:

1. Data. States will need information for early identification of children in the target population. State agencies?like housing, justice, child welfare, education, and public health have this information?and external organizations—such as childcare, faith-based, and recreation groups—are also good sources of early identification. It is immensely complicated to access data from these disparate sources. State Medicaid agencies will be required to support local implementation by providing population-level data for the targeted geographic service area.

  • Data collection challenges include a lack of standardized measures for SDoH and ACEs, common data field definitions, or consistent approaches to data classification; security and privacy of protected health information; and IT development costs.
  • Data-sharing agreements with internal and external sources will be critical for state Medicaid agencies to develop, while remaining mindful of protected health information regulations.
  • Once data-sharing agreements are in place, these disparate data sources, with differing file structures and nomenclature, will require integration. The integrated data must then be able to identify and risk-stratify the target population.

For any evaluative approach or any APM to be effective, clear quality and outcome measures must be developed and adopted across all relevant partner organizations.

2. Eligibility. Reliable, integrated eligibility and enrollment systems are crucial points of identification and make it easier to connect to needed services.

  • Applicants for one-benefit programs should be screened for eligibility for all programs they may need to achieve positive health outcomes.
  • Any agency at which potential beneficiaries appear should also have enrollment capability, so it is easier to access services.

3. Payment models. State Medicaid agencies may cover case management services and/or targeted case management as well as health homes; leverage Early and Periodic Screening, Diagnostic, and Treatment (EPSDT) services; and modify managed care organization contract language to encourage, incent, and in some cases, require services related to the InCK model and SDoH. Value-based payment models, already under exploration in numerous states, include four basic approaches:

  • Pay for performance—provider payments are tied directly to specific quality or efficiency indicators, including health outcomes under the provider organization’s control. 
  • Shared savings/risk—some portion of the organization’s compensation depends on the managed care entity achieving cost savings for the targeted patient population, while realizing specific health outcomes or quality improvement.
  • Pay for success—payment is dependent upon achieving desired outcomes rather than underlying services.
  • Capitated or bundled payments—managed care entities pay an upfront per member per month lump sum payment to an organization for community care coordination activities and link that with fee-for-service reimbursement for delivering value-added services.

By focusing on upstream prevention, comprehensive service delivery, and alternative payment models, the InCK model is a promising vehicle to positively impact children’s health. Though its components require significant thought, strategy, coordination, and commitment from state Medicaid agencies and partners, there are early innovators providing helpful examples and entities with vast Section 1115 waiver development and Medicaid innovation experience available to assist.

As state Medicaid agencies develop and implement primary and secondary prevention, cost savings can be achieved while meaningful improvements are made in children’s lives.

Article
Three factors state medicaid agencies should consider when applying for InCK funding

Are you struggling to improve business outcomes through modifications to your software solutions? If so, then you have no doubt tried — or are trying — traditional software implementation approaches. Yet, these methods can overwhelm staff, require strong project management, and consume countless hours (and dollars).

It may be time for your organization to consider the DevOps (Development and Operations) implementation model — a software implementation approach that uses agile methodologies.

The DevOps implementation model — proven to be effective in upgrading large software solutions such as Integrated Eligibility and Enrollment — increases organizational flexibility with frequent prioritization of business problems.

An alternative approach
In contrast to traditional software implementation approaches, the DevOps implementation model features continuous collaboration by the development and operations teams in breaking down, prioritizing, and implementing solution fixes in small release packages. Positive results include improved business prioritization through collaboration, better management of the backlog of software requests, focused development staff efforts, and high-velocity implementation of each release — leading to an improved software solution.

Here are seven essential implementation steps for adopting the DevOps implementation model:

Step 1: Define your software solution’s backlog of outstanding business problems — Understanding the business problems is the first step towards solving them.

Step 2: Prioritize the business backlog using such factors as:

  • Operational impact
  • Priority and severity levels
  • Development level of effort
  • Infrastructure considerations


Step 3: Schedule regular team meetings to address the status, prioritization, and resolution of the software solution’s business backlog — keeping the team focused and coordinated increases your efficiency towards resolution.

Step 4: Group prioritized items into small work packages that you can release through the software development life cycle (SDLC) in two- to three-week efforts —helping to keep work packages in small, organized, and manageable packages.

Step 5: Cycle each release through the various stages of the SDLC, utilizing an implementation approach that is defined, documented, and approved by all key stakeholders —providing a predictable and repeatable process for simultaneous development of multiple work packages.

Step 6: Schedule work package releases for implementation to help coordination and planning activities with stakeholders prior to implementation.

Step 7: Implement and integrate the software solution into operations. Making sure stakeholders are aware of release changes is critical for the success of a release. Be sure staff are trained ahead of the release, and that changes are communicated to all appropriate audiences.

You can pair DevOps with other methodologies. This allows you to address smaller components of functionality through DevOps while leaving larger components of functionality to traditional methodologies.

Other considerations:

  • Once you resolve the business problem, monitor the solution to make sure the release did not negatively impact other areas of your software solution.
  • Ensure the software solution is supported by management plans (e.g., change, configuration, and issue management plans) that are thorough and approved by the key stakeholders. This will help ensure expectations of processes and procedures are agreed upon.
  • Maintain the list of business problems in a location accessible to all key stakeholders for awareness, accessibility, and accountability purposes.
  • Communicate, report, and manage the status, definition, and/or resolution of issues and/or defects in a consistent, concise, and clear manner to assist in efficiently prioritizing and addressing your business problems.
  • Begin communicating the impact of the issue and/or defect as soon as possible–the sooner the issue and/or defect is known; the quicker the team can begin down the path towards resolution.
  • Develop materials to train affected staff. Clear and concise training materials will help educate and communicate updated processes to stakeholders.

Improving your software solution
Finding a way to improve your software solution does not always mean using traditional software implementation approaches. Based on our experience, we’ve learned that collaboration between the development and operations teams, and continuously repeating the seven steps of the DevOps implementation model, allows organizations to efficiently address software solution problems.

Interested in learning more about how the DevOps implementation model could work for your organization? Please contact Zachary Rioux.

Article
DevOps: Advance software solutions and improve outcomes

A year ago, CMS released the Medicaid Enterprise Certification Toolkit (MECT) 2.1: a new Medicaid Management Information Systems (MMIS) Certification approach that aligns milestone reviews with the systems development life cycle (SDLC) to provide feedback at key points throughout design, development, and implementation (DDI).

The MECT (recently updated to version 2.2) incorporates lessons learned from pilot certifications in several states, including the successful West Virginia pilot that BerryDunn supported. MECT updates have a direct impact on E&E systems—an impact that may increase in the near future. Here is what you need to know:         

Then: Initial Release

In February 2017, CMS introduced six Eligibility & Enrollment (E&E) checklists. Five were leveraged from the MECT, while the sixth checklist contained unique E&E system functionality criteria and provided a new E&E SDLC that—like the MECT—depicted three milestone reviews and increased the Independent Verification and Validation (IV&V) vendor’s involvement in the checklists completion process.

Now: Getting Started

Completing the E&E checklists will help states ensure the integrity of their E&E systems and help CMS guide future funding. This exercise is no easy task, particularly when a project is already in progress. Completion of the E&E checklists involves many stakeholders, including:

  • The state (likely more than one agency)
  • CMS
  • IV&V
  • Project Management Office (PMO)
  • System vendor(s)

As with any new processes, there are challenges with E&E checklists completion. Some early challenges include:

  • Completing the E&E checklists with limited state project resources
  • Determining applicable criteria for E&E systems, especially for checklists shared with the MMIS
  • Identifying and collecting evidence for iterative projects where criteria may not fall cleanly into one milestone review phase
  • Completing the E&E checklists with limited state project resources
  • Working with the system vendor(s) to produce evidence

What’s Next?

Additionally, working with system vendors may prove tricky for projects that already have contracts with E&E vendors, as E&E systems are not currently subject to certification (unlike the MMIS). This may lead to instances where E&E vendors are not contractually obligated to provide the evidence that would best satisfy CMS criteria. To handle this and other challenges, states should communicate risks and issues to CMS and work together to resolve or mitigate them.

As CMS partners with states to implement the E&E checklists, some questions are expected to be asked. For example, how much information can be leveraged from the MECT, and how much of the checklists completion process must be E&E-specific? Might certification be required in the near future for E&E systems?

While there will be more to learn and challenges to overcome, the first states completing the E&E checklists have an opportunity to lead the way on working with CMS to successfully build and implement E&E systems that benefit all stakeholders.

On July 31, 2017, CMS released the MECT 2.2 as an update to the MECT 2.1.1. As the recent changes continue to be analyzed, what will the impact be to current and future MMIS and E&E projects?

Check back here at BerryDunn Briefings in the coming weeks and we will help you sort it out.