Skip to Main Content

insightsarticles

Two ways states can improve their
COVID-
19 vaccination distribution plans

By:

Simone is a consultant in our Government consulting area. She holds a degree in health management and policy from the University of New Hampshire and has experience in health care project management, and event management and coordination for non-profit organizations. Simone currently performs business analyst and project coordination support across the state practice area for the public health and child welfare teams

Simone Zuchowski
01.15.21

Read this if your agency is involved with COVID-19 vaccination distribution.

Although states have already created COVID-19 vaccination plans, your state can still implement critical strategies to improve your distribution plan. In October 2020, the Centers for Disease Control (CDC) released the Interim Playbook version 2.0, providing a key framework for states and jurisdictions to build their COVID-19 vaccine distribution plans. The federal government asked that immunization programs in each state plans based on this model. The Playbook contains 15 sections of planning elements for states to consider in the development of their plan. Completing a plan of this extent while simultaneously trying to manage the pandemic has led some states to leave out or not thoroughly address critical components in their plans. 

The Kaiser Family Foundation (KFF) analyzed and collected common themes from each of the 47 state vaccination plans. Their analysis identified areas of weakness in the following areas of each plan: 

  • Priority populations for vaccinations in states 
  • Identifying networks of providers 
  • Developing data collection and reporting
  • Forming communication strategies

Each of the four areas each contained multiple findings, but since the vaccine has already started to roll out, some aspects of the plan cannot be revised. However, it is not too late to improve upon certain elements, especially for data collection and reporting, as well as communication strategies. 

The following recommendations for improvement of state plans are based on the findings from the KFF State COVID-19 vaccine distribution analysis report

States should identify a clear data reporting and collection plan that accounts for the COVID-19-specific data requirements.

According to KFF, an immunization registry or database has been included in 53% of the state COVID-19 plans; in the others it was an unclear component of the plan. The data collection process for COVID-19 vaccinations will be complex and unique due to a number of factors including the nature of a phased rollout, new provider enrollment and onboarding, storage requirements, multiple vaccines and doses, and off-site vaccination locations

Since a little over half of all states have arranged for either new systems or are developing or adding features to current immunization registries, states that are lacking a comprehensive approach could benefit from adopting elements present in the other plans. For example, some states detail how their current immunization system is being utilized for the COVID-19 vaccine, in addition to upgrading certain features in order to meet the anticipated increase in demand. 

Other states have also described their transition to the Immunization Gateway, a centralized technical infrastructure sponsored by the CDC Immunization Information Systems Support Branch, and led by the US Department of Health and Human Services Office of the Chief Technology Officer. The Gateway is securely hosted through the Association of Public Health Laboratories (APHL). States can review the data collection and reporting sections of other states’ plans to gain a greater understanding of how their plan can be improved by describing data reporting and collection processes.   

States should address racial and ethnic disparities in vaccine distribution and acceptance through targeted and evidence-based communication strategies. 

The KFF analysis of state COVID-19 plans indicated about 49% of state plans include specific mention of racial or ethnic minority populations in regards to communication. Communication plans need to include targeted strategies as minority populations and people of color have shown greater hesitation in receiving the vaccine, even if it is free and determined safe by scientists and federal authorities. The virus has had a disproportionate impact on communities of color and minority populations, and a lack of communication to these populations may continue to enhance these disparate health outcomes.

One way to improve a communication plan by addressing racial or ethnic minority populations would be by incorporating the National Standards for Culturally and Linguistically Appropriate Services (CLAS), specifically the standards for Communication and Language Assistance:

  • Offer language assistance to individuals who have limited English proficiency and/or other communication needs, at no cost to them, to facilitate timely access to all health care and services
  • Inform all individuals of the availability of language assistance services clearly and in their preferred language, verbally and in writing
  • Ensure the competence of individuals providing language assistance, recognizing that the use of untrained individuals and/or minors as interpreters should be avoided
  • Provide easy-to-understand print and multimedia materials and signage in the languages commonly used by the populations in the service area

A communication plan that considers the racial and ethnic minority populations most vulnerable to adverse health outcomes and have shown a lack of trust in the scientific community would be advisable in order to combat disproportionate negative outcomes from the COVID-19 virus in the future. 

A COVID-19 vaccine distribution plan is an important aspect of each state’s strategy to control the spread of the virus. In order to lead to effective vaccine distribution, it is vital for the plans to thoroughly address data collection, reporting, and tracking. It is also important to consider implementing a communication plan that incorporates strategies to reach racial and ethnic minority groups who might have been disproportionality impacted by COVID-19 as a way to improve your state’s health equity approach to COVID-19 vaccination efforts. By implementing these considerations, your state’s COVID-19 vaccine distribution plan could become more effective in improving the health outcomes of your population. 

Related Industries

Related Services

Consulting

Information Systems

Organizational and Governance

Related Professionals

Principals

Simone is a consultant in our Government consulting area. She holds a degree in health management and policy from the University of New Hampshire and has experience in health care project management, and event management and coordination for non-profit organizations. Simone currently performs business analyst and project coordination support across the state practice area for the public health and child welfare teams.

Professional
Simone Zuchowski

There’s a good chance that your organization is in the position of needing to do more with less under the strain of staffing constraints and competing initiatives. With fewer resources to work with, you’ll need to be persuasive to get the green light on new enterprise technology initiatives. To do that, you need to present decision makers with well-thought-out and targeted business cases that show your initiative will have impact and will be successful. Yet developing such a business case is no walk in the park. Perhaps because our firm has its roots in New England, we sometimes compare this process to leading a hiking trip into the woods—into the wild. 

Just as in hiking, success in developing a business case for a new initiative boils down to planning, preparation, and applying a few key concepts we’ve learned from our travels. 

Consensus is critical when planning new technology initiatives

Before you can start the hike, everyone has to agree on some fundamentals: 

Who's going? 

Where are we going? 

When do we go and for how long? 

Getting everyone to agree requires clear communication and, yes, even a little salesmanship: “Trust me. The bears aren’t bad this time of year.” The same principle applies in proposing new technology initiatives; making sure everyone has bought into the basic framework of the initiative is critical to success.

Although many hiking trips involve groups of people similar in age, ability, and whereabouts, for your business initiative you need to communicate with diverse groups of colleagues at every level of the organization. Gaining consensus among people who bring a wide variety of skills and perspectives to the project can be complex.

To gain consensus, consider the intended audiences of your message and target the content to what will work for them. It should provide enough information for executive-level stakeholders to quickly understand the initiative and the path forward. It should give people responsible for implementation or who will provide specific skills substantive information to implement the plan. And remember: one of the most common reasons projects struggle to meet their stated objectives (and why some projects never materialize to begin with), is a lack of sponsorship and buy-in. The goal of a business case is to gain buy-in before project initiation, so your sponsors will actively support the project during implementation. 

Set clear goals for your enterprise technology project 

It’s refreshing to take the first steps, to feel that initial sense of freedom as you set off down the trail. Yet few people truly enjoy wandering around aimlessly in the wilderness for an extended period of time. Hikers need goals, like reaching a mountain peak or seeing famous landmarks, or hiking a predetermined number of miles per day. And having a trail guide is key in meeting those goals. 

For a new initiative, clearly define goals and objectives, as well as pain points your organization wishes to address. This is critical to ensuring that the project’s sponsors and implementation team are all on the same page. Identifying specific benefits of completing your initiative can help people keep their “eyes on the prize” when the project feels like an uphill climb.

Timelines provide additional detail and direction—and demonstrate to decision makers that you have considered multiple facets of the project, including any constraints, resource limitations, or scheduling conflicts. Identifying best practices to incorporate throughout the initiative enhances the value of a business case proposition, and positions the organization for success. By leveraging lessons learned on previous projects, and planning for and mitigating risk, the organization will begin to clear the path for a successful endeavor. 

Don’t compromise on the right equipment

Hiking can be an expensive, time-consuming hobby. While the quality of your equipment and the accuracy of your maps are crucial, you can do things with limited resources if you’re careful. Taking the time to research and purchase the right equipment, (like the right hiking boots), keeps your fun expedition from becoming a tortuous slog. 

Similarly, in developing a business case for a new initiative, you need to make sure that you identify the right resources in the right areas. We all live with resource constraints of one sort or another. The process of identifying resources, particularly for funding and staffing the project, will lead to fewer surprises down the path. As many government employees know all too well, it is better to be thorough in the budget planning process than to return to authorizing sources for additional funding while midstream in a project. 

Consider your possible outcomes

You cannot be too singularly focused in the wild; weather conditions change quickly, unexpected opportunities reveal themselves, and being able to adapt quickly is absolutely necessary in order for everyone to come home safely. Sometimes, you should take the trail less traveled, rest in the random lean-to that you and your group stumble upon, or go for a refreshing dip in a lake. By focusing on more than just one single objective, it often leads to more enjoyable, safe, and successful excursions.

This type of outlook is necessary to build a business case for a new initiative. You may need to step back during your initial planning and consider the full impact of the process, including on those outside your organization. For example, you may begin to identify ways in which the initiative could benefit both internal and external stakeholders, and plan to move forward in a slightly new direction. Let’s say you’re building a business case for a new land management and permitting software system. Take time to consider that this system may benefit citizens, contractors, and other organizations that interact with your department. This new perspective can help you strengthen your business case. 

Expect teamwork

A group that doesn’t practice teamwork won’t last long in the wild. In order to facilitate and promote teamwork, it’s important to recognize the skills and contributions of each and every person. Some have a better sense of direction, while some can more easily start campfires. And if you find yourself fortunate enough to be joined by a truly experienced hiker, make sure that you listen to what they have to say.

Doing the hard work to present a business case for a new initiative may feel like a solitary action at times, but it’s not. Most likely, there are other people in your organization who see the value in the initiative. Recognize and utilize their skills in your planning. We also suggest working with an experienced advisor who can leverage best practices and lessons learned from similar projects. Their experience will help you anticipate potential resistance and develop and articulate the mitigation strategies necessary to gain support for your initiative.

If you have thoughts, concerns, or questions, contact our team. We love to discuss the potential and pitfalls of new initiatives, and can help prepare you to head out into the wild. We’d love to hear any parallels with hiking and wilderness adventuring that you have as well. Let us know! 

BerryDunn’s local government consulting team has the experience to lead technology planning initiatives and develop actionable plans that help you think strategically and improve service delivery. We partner with you, maintaining flexibility and open lines of communication to help ensure that your team has the resources it needs.

Our team has broad and deep experience partnering with local government clients across the country to modernize technology-based business transformation projects and the decision-making and planning efforts. Our expertise includes software system assessments/planning/procurement and implementation project management; operational, management, and staffing assessments; information security; cost allocation studies; and data management.  

Article
Into the wild: Building a business case for a new enterprise technology project

Read this if your organization is planning on upgrading or replacing an enterprise technology system.

It can be challenging and stressful to plan for technology initiatives, especially those that involve and impact every area of your organization. Common initiatives include software upgrades or replacements for:

  • Financial management, such as Enterprise Resource Planning (ERP) systems
  • Asset management systems
  • Electronic health records (EHR) systems
  • Permitting and inspections systems

Though the number of considerations when planning enterprise technology projects can be daunting, the greatest mistake you can make is not planning at all. By addressing just a few key areas, you can avoid some of the most common pitfalls, such as exceeding budget and schedule targets, experiencing scope creep, and losing buy-in among stakeholders. Here are some tips to help you navigate your next project:

Identify your IT project roles and resources

While most organizations understand the importance of identifying project stakeholder groups, it is often an afterthought. Defining these roles at the outset of your project helps you accurately estimate the work effort.

Your stakeholder groups may include:

  • An executive sponsor
  • A steering committee
  • A project manager
  • Functional leads
  • A technical team

Once you’ve established the necessary roles, you can begin reviewing your organization’s resources to determine the people who will be available to fill them. Planning for resource availability will help you avoid delays, minimize impact to regular business processes, and reduce the likelihood of burnout. But this plan won’t remain static—you can expect to make updates throughout the project.

Establish clear goals and objectives to keep your technology project on track

It’s important that an enterprise technology project has established goals and objectives statements. These statements will help inform decision-making, provide benchmarks for progress, and measure your project’s success. They can then be referenced when key stakeholders have differing perspectives on the direction to take with a pending decision. For example, if the objective of your project is to reduce paper-based processes, you may plan for additional computer workstations and focus technical resources on provisioning them. You’ll also be able to measure your success in the reduction of paper-based tasks.

Estimate your IT project budget accurately

Project funding is hardly ever overlooked, but can be complex with project budgets that are either underestimated or estimated without sufficient rationale to withstand approval processes and subsequent budget analysis. You may find that breaking down estimates to a lower level of detail helps address these challenges. Most technology projects incur costs in three key areas:

  • Vendor cost: This could include both one-time software implementation costs as well as recurring costs for maintenance and ongoing support.
  • Infrastructure cost: Consider the cost of any investments needed to support your project, such as data center hardware, networking components, or computing devices.
  • Supplemental resource cost: Don’t forget to include the cost of any additional resources needed for their specialized knowledge or to simply backfill project staff. This could include contracted resources or the additional cost of existing resources (i.e., overtime).

A good technology project budget also includes a contingency amount. This amount will depend on your organization’s standards, the relative level of confidence in your estimates, and the relative risk.

Anticipate the need for change management

Depending on the project, staff in many areas of your organization will be impacted by some level of change during a technology implementation. External stakeholders, such as vendors and the public, may also be affected. You can effectively manage this change by proactively identifying areas of likely change resistance and creating strategies to address them.

In any technology implementation, you will encounter change resistance you did not predict. Having strategies in place will help you react quickly and effectively. Some proven change management strategies include communicating throughout your project, involving stakeholders to get their buy-in, and helping ensure management has the right amount of information to share with their employees.

Maintain focus and stay flexible as you manage your IT project

Even with the most thought-out planning, unforeseen events and external factors may impact your technology project. Establish mechanisms to regularly and proactively monitor project status so that you can address material risks and issues before their impact to the project grows. Reacting to these items as they arise requires key project stakeholders to be flexible. Key stakeholders must recognize that new information does not necessarily mean previous decisions were made in error, and that it is better to adapt than to stick to the initial direction.

Whether you’re implementing an ERP, an EHR, or enterprise human resources or asset management systems, any enterprise technology project is a massive undertaking, involving significant investment and a coordinated effort with individuals across multiple areas of an organization. Common mistakes can be costly, but having a structured approach to your planning can help avoid pitfalls. Our experienced, objective advisors have worked with public and private organizations across the country to oversee large enterprise projects from inception to successful completion.

Contact our software consulting team with any questions.

Article
Planning for a successful enterprise technology project

Read this if your company is considering outsourced information technology services.

For management, it’s the perennial question: Keep things in-house or outsource?

For management, it’s the perennial question: Keep things in-house or outsource? Most companies or organizations have outsourcing opportunities, from revenue cycle to payment processing to IT security. When deciding whether to outsource, you weigh the trade-offs and benefits by considering variables such as cost, internal expertise, cross coverage, and organizational risk.

In IT services, outsourcing may win out as technology becomes more complex. Maintaining expertise and depth for all the IT components in an environment can be resource-intensive.

Outsourced solutions allow IT teams to shift some of their focus from maintaining infrastructure to getting more value out of existing systems, increasing data analytics, and better linking technology to business objectives. The same can be applied to revenue cycle outsourcing, shifting the focus from getting clean bills out and cash coming in, to looking at the financial health of the organization, analyzing service lines, patient experience, or advancing projects.  

Once you’ve decided, there’s another question you need to ask
Lost sometimes in the discussion of whether to use outsourced services is how. Even after you’ve done your due diligence and chosen a great vendor, you need to stay involved. It can be easy to think, “Vendor XYZ is monitoring our servers or our days in AR, so we should be all set. I can stop worrying at night about our system reliability or our cash flow.” Not true.

You may be outsourcing a component of your technology environment or collections, but you are not outsourcing the accountability for it—from an internal administrative standpoint or (in many cases) from a legal standpoint.

Beware of a false state of confidence
No matter how clear the expectations and rules of engagement with your vendor at the onset of a partnership, circumstances can change—regulatory updates, technology advancements, and old-fashioned vendor neglect. In hiring the vendor, you are accountable for oversight of the partnership. Be actively engaged in the ongoing execution of the services. Also, periodically revisit the contract, make sure the vendor is following all terms, and confirm (with an outside audit, when appropriate) that you are getting the services you need.

Take, for example, server monitoring, which applies to every organization or company, large or small, with data on a server. When a managed service vendor wants to contract with you to provide monitoring services, the vendor’s salesperson will likely assure you that you need not worry about the stability of your server infrastructure, that the monitoring will catch issues before they occur, and that any issues that do arise will be resolved before the end user is impacted. Ideally, this is true, but you need to confirm.

Here’s how to stay involved with your vendor
Ask lots of questions. There’s never a question too small. Here are samples of how precisely you should drill down:

  • What metrics will be monitored, specifically?
  • Why do the metrics being monitored matter to our own business objectives?
  • What thresholds must be met to notify us or produce an alert?
  • What does exceeding a threshold mean to our business?
  • Who on our team will be notified if an alert is warranted?
  • What corrective action will be taken?

Ask uncomfortable questions
Being willing to ask challenging questions of your vendors, even when you are not an expert, is critical. You may feel uncomfortable but asking vendors to explain something to you in terms you understand is very reasonable. They’re the experts; you’re not expected to already understand every detail or you wouldn’t have needed to hire them. It’s their job to explain it to you. Without asking these questions, you may end up with a fairly generic solution that does produce a service or monitor something, but not necessarily all the things you need.

Ask obvious questions
You don’t want anything to slip by simply because you or the vendor took it for granted. It is common to assume that more is being done by a vendor than actually is. By asking even obvious questions, you can avoid this trap. All too often we conduct an IT assessment and are told that a vendor is providing a service, only to discover that the tasks are not happening as expected.

You are accountable for your whole team—in-house and outsourced members
An outsourced solution is an extension of your team. Taking an active and engaged role in an outsourcing partnership remains consistent with your management responsibilities. At the end of the day, management is responsible for achieving business objectives and mission. Regularly check in to make sure that the vendor stays focused on that same mission.

Article
Oxymoron of the month: Outsourced accountability

Read this if you are a police executive, city/county administrator, or elected government official, responsible for a law enforcement agency. 

“We need more cops!”  

Do your patrol officers complain about being short-staffed or too busy, or that they are constantly running from call to call? Does your agency struggle with backed-up calls for service (CFS) or lengthy response times? Do patrol staff regularly find themselves responding to another patrol area to handle a CFS because the assigned officer is busy on another call? Are patrol officers denied leave time or training opportunities because of staffing issues? Does the agency routinely use overtime to cover predictable shift vacancies for vacations, holidays, or training? 

If one or more of these concerns sound familiar, you may need additional patrol resources, as staffing levels are often a key factor in personnel deployment challenges. Flaws in the patrol schedule design may also be responsible, as they commonly contribute to reduced efficiency and optimal performance, and design issues may be partially responsible for some of these challenges, regardless of authorized staffing levels.
 
With community expectations at an all-time high, and resource allocations remaining relatively flat, many agencies have growing concerns about managing increasing service volumes while controlling quality and building/maintaining public trust and confidence. Amid these concerns, agencies struggle with designing work schedules that efficiently and optimally deploy available patrol resources, as patrol staff become increasingly frustrated at what they consider a lack of staff.

The path to resolving inefficiencies in your patrol work schedule and optimizing the effective deployment of patrol personnel requires thoughtful consideration of several overarching goals:

  • Reducing or eliminating predictable overtime
  • Eliminating peaks and valleys in staffing due to scheduled leave
  • Ensuring appropriate staffing levels in all patrol zones or beats
  • Providing sufficient staff to manage multiple and priority CFS in patrol zones or beats
  • Satisfying both operational and staff needs, including helping to ensure a proper work/life balance and equitable workloads for patrol staff

Scheduling alternatives

One common design issue that presents an ongoing challenge for agencies is the continued use of traditional, balanced work schedules, which spread officer work hours equally over the year. Balanced schedules rely on over-scheduling and overtime to manage personnel allocation and leave needs and, by design, are very rigid. Balanced work schedules have been used for a very long time, not because they’re most efficient, but because they’re common, familiar, and easily understood―and because patrol staff are comfortable with them (and typically reluctant to change). However, short schedules offer a proven alternative to balanced patrol work schedules, and when presented with the benefits of an alternative work schedule design (e.g., increased access to back-up, ease of receiving time off or training, consistency in staffing, less mandatory overtime), many patrol staff are eager to change.

Short schedules

Short schedules involve a more contemporary design that includes a flexible approach that focuses on a more adaptive process of allocating personnel where and when they are needed. They are significantly more efficient than balanced schedules and, when functioning properly, they can dramatically improve personnel deployments, bring continuity to daily staffing, and reduce overtime, among other operational benefits. Given the current climate, most agencies are unlikely to receive substantial increases in personnel allocations. If that is true of your agency, it may be time to explore the benefits of alternative patrol work schedules.

A tool you can use

Finding scheduling strategies that work in this climate requires an intentional approach, customized to your agency’s characteristics (e.g., staffing levels, geographic factors, crime rates, zone/beat design, contract/labor rules). To help guide you through this process, BerryDunn has developed a free tool for evaluating patrol schedules. Click here to measure your patrol schedule against key design components and considerations.

If you are curious about alternative patrol work schedules, our dedicated justice and public Safety consultants are available to discuss your organization’s needs.

Article
Efficient police patrol work schedules―By design

Law enforcement, courts, prosecutors, and corrections personnel provide many complex, seemingly limitless services. Seemingly is the key word here, for in reality these personnel provide a set number of incredibly important services.

Therefore, it should surprise no one that justice and public safety (J&PS) IT departments should also provide a well-defined set of services. However, these departments are often viewed as parking lots for all technical problems. The disconnect between IT and other J&PS business units often stems from differences in organizational culture and structure, and differing department objectives and goals. As a result, J&PS organizations often experience misperception between business units and IT. The solution to this disconnect and misperception? Defining IT department services.

The benefits of defined IT services

  1. Increased business customer satisfaction. Once IT services align with customer needs, and expectations are established (e.g., service costs and service level agreements), customers can expect to receive the services they agreed to, and the IT department can align staff and skill levels to successfully meet those needs.
  2. Improved IT personnel morale. With clear definition of the services they provide to their customers, including clearly defined processes for customers to request those services, IT personnel will no longer be subject to “rogue” questions or requests, and customers won’t be inclined to circumvent the process. This decreases IT staff stress and enables them to focus on their roles in providing the defined services. 
  3. Better alignment of IT services to organizational needs. Through collaboration between the business and IT organizations, the business is able to clearly articulate the IT services that are, and aren’t, required. IT can help define realistic service levels and associated services costs, and can align IT staff and skills to the agreed-upon services. This results in increased IT effectiveness and reduced confusion regarding what services the business can expect from IT.
  4. More collaboration between IT and the organization. The collaboration between the IT and business units in defining services results in an enhanced relationship between these organizations, increasing trust and clarifying expectations. This collaborative model continues as the services required by the business evolve, and IT evolves to support them.
  5. Reduced costs. J&PS organizations that fail to strategically align IT and business strategy face increasing financial costs, as the organization is unable to invest IT dollars wisely. When a business doesn’t see IT as an enabler of business strategy, IT is no longer the provider of choice—and ultimately risks IT services being outsourced to a third-party vendor.

Next steps
Once a J&PS IT department defines its services to support business needs, it then can align the IT staffing model (i.e., numbers of staff, skill sets, roles and responsibilities), and continue to collaborate with the business to identify evolving services, as well as remove services that are no longer relevant. Contact us for help with this next step and other IT strategies and tactics for justice and public safety organizations.

Article
The definition of success: J&PS IT departments must define services

“The world is one big data problem,” says MIT scientist and visionary Andrew McAfee.

That’s a daunting (though hardly surprising) quote for many in data-rich sectors, including higher education. Yet blaming data is like blaming air for a malfunctioning wind turbine. Data is a valuable asset that can make your institution move.

To many of us, however, data remains a four-letter word. The real culprit behind the perceived data problem is our handling and perception of data and the role it can play in our success—that is, the relegating of data to a select, responsible few, who are usually separated into hardened silos. For example, a common assumption in higher education is that the IT team can handle it. Not so. Data needs to be viewed as an institutional asset, consumed by many and used by the institution for the strategic purposes of student success, scholarship, and more.

The first step in addressing your “big” data problem? Data governance.

What is data governance?

There are various definitions, but the one we use with our clients is “the ongoing and evolutionary process driven by leaders to establish principles, policies, business rules, and metrics for data sharing.”

Please note that the phrase “IT” does not appear anywhere in this definition.

Why is data governance necessary? For many reasons, including:

  1. Data governance enables analytics. Without data governance, it’s difficult to gain value from analytics initiatives which will produce inconsistent results. A critical first step in any data analytics initiative is to make sure that definitions are widely accepted and standards have been established. This step allows decision makers to have confidence in the data being analyzed to describe, predict, and improve operations.
     
  2. Data governance strengthens privacy, security, and compliance. Compliance requirements for both public and private institutions constantly evolve. The more data-reliant your world becomes, the more protected your data needs to be. If an organization does not implement security practices as part of its data governance framework, it becomes easier to fall out of compliance. 
     
  3. Data governance supports agility. How many times have reports for basic information (part-time faculty or student FTEs per semester, for example) been requested, reviewed, and returned for further clarification or correction? And that’s just within your department! Now add multiple requests from the perspective of different departments, and you’re surely going through multiple iterations to create that report. That takes time and effort. By strengthening your data governance framework, you can streamline reporting processes by increasing the level of trust you have in the information you are seeking. Understanding the value of data governance is the easy part/ The real trick is implementing a sustainable data governance framework that recognizes that data is an institutional asset and not just a four-letter word.

Stay tuned for part two of this blog series: The how of data governance in higher education. In the meantime, reach out to me if you would like to discuss additional data governance benefits for your institution.

Article
Data is a four-letter word. Governance is not.

If you’ve been tasked with leading a high-impact project for your organization, you may find managing the scope, budget and schedule is not enough to ensure project success—especially when you encounter resistance to change. When embarking on large-scale change projects spanning people, processes and technology, appointing staff as “coaches” to help support stakeholders through the change—and to manage resistance to the change—can help increase adoption and buy-in for a new way of doing things.

The first step is to identify candidates for the coaching role. These candidates are often supervisory staff who have credibility in the organization—whether as a subject matter expert, through internal leadership, or from having a history of client satisfaction. Next, you need a work plan to orient them to this role. One critical component is making sure the coaches themselves understand what the change means for their role, and have fully committed before asking them to coach others. They may exhibit initial resistance to the change you will need to manage before they can be effective coaches. According to research done by Prosci®, a leading change management research organization, some of the most common reasons for supervisor resistance in large-scale change projects are:

  • Lack of awareness about and involvement in the change
  • Loss of control or negative impact on job role
  • Increased work load (i.e., lack of time)
  • Culture of change resistance and past failures
  • Impact to their team

You should anticipate encountering these and other types of resistance from staff while preparing them to be coaches. Once coaches buy into the change, they will need ongoing support and guidance to fulfill their role. This support will vary by individual, but may be correlated to what managerial skills they already possess, or don’t. How can you focus on developing coaching skills among your staff for purposes of the project? Prosci® recommends a successful change coach take on the following roles:

  • Communicator—communicate with direct reports about the change
  • Liaison—engage and liaise with the project team
  • Advocate—advocate and champion the change
  • Resistance manager—identify and manage resistance
  • Coach—coach employees through the change

One of the initial tasks for your coaches will be to assess the existing level of change resistance and evaluate what resistance you may encounter. Prosci® identifies three types of resistance management work for your coaches to begin engaging in as they meet with their employees about the change:

  • Resistance prevention―by providing engagement opportunities for stakeholders throughout the project, building awareness about the change early on, and reinforcing executive-level support, coaches can often head off expected resistance.
  • Proactive resistance management―this approach requires coaches to anticipate the needs and understand the characteristics of their staff, and assess how they might react to change in light of these attributes. Coaches can then plan for likely forms of resistance in advance, with a structured mitigation approach.
  • Reactive resistance management―this focuses on resistance that has not been mitigated with the previous two types of resistance management, but instead persists or endures for an extended amount of time. This type of management may require more analysis and planning, particularly as the project nears its completion date.

Do you have candidates in your organization who may need support transitioning into coaching roles? Do you anticipate change resistance among your stakeholders? Contact us and we can help you develop a plan to address your specific challenges.

Article
How to identify and prepare change management coaches